While the previous pages on this site detailed the complete Phil Collins Transcription Radio Shows, along with the Collins and Genesis Radio Interview Shows, I do have many other similar shows from a number of other bands and artists in my collection. This page will detail all of the remaining radio shows that I have in my personal collection, both interview specials and concert broadcasts. This is not meant to be a definitive listing of all of the known shows from each band or artists, as was the case with the PC and Genesis shows, this is simply a place to find details of other shows that I have purchased. Perhaps you will find some information herein that will be helpful. I truly hope so.
And as an aside, you may have noticed on the previous pages (and on this page as well) that I sometimes use the narrative descriptions from Discogs in my descriptions here. That is because in almost every case, I was the original submitter of the items on Discogs. Especially the Genesis and Phil Collins material. When I joined Discogs, most of these radio transcription shows did not exist on the site.  Thus, it fell to me to add them. So I am not plagiarizing when I utilize those notes, I am simply copying what I originally provided to that site. If you have any questions about the shows listed here, please reach out to me via the Contact Me page.
*One Note: On this page you will find every Genesis radio transcription concert show that I own. Unlike the Phil Collins concerts, these shows are not listed elsewhere on this site because, as mentioned in the Complete Phil Collins Radio Guide, Dave Dunnington has done a fantastic job of cataloging all of the Genesis shows on his site. You can see that list HERE. I am not intending to be redundant by listing some of those same shows here. Again, I am simply cataloging the shows that I have in my collection. So let’s get started…

The Eagles

King Biscuit Flower Hour Presents A Conversation With The Eagles #C-307:

D.I.R. Broadcasting Records

Unknown recording date

Original Broadcast –
Week of 23 March 1980

pre-FM Triple Vinyl LP

The folks at King Biscuit and nationally syndicated DJ Dave Herman present an interview with The Eagles regarding their career and their latest release (at that time) EAGLES LIVE. Unlike most Biscuit shows, this is not a live concert recording, rather, it’s an “intimate” discussion featuring Don Felder, Don Henley, Glenn Frey, Joe Walsh and Timothy B. Schmit. All five members of the band are interviewed by Herman. Contains original commercial blocks and DJ introductions by Herman. 

Complete track listing can be found here:

KBFH #C 307 Conversation With The Eagles on Discogs

Bob Seger

King Biscuit Flower Hour Presents A Conversation With Bob Seger #BOB 309:

D.I.R. Broadcasting Records

Unknown recording date

Original Broadcast –
Week of 6 April 1980

pre-FM Double Vinyl LP

Another Biscuit “conversation” release with Host Dave Herman. Here, Herman presents an interview with Bob Seger regarding his career and his latest release (at that time) AGAINST THE WIND. Unlike most Biscuit shows, this is not a live concert recording. As noted during the broadcast, the interview segments were originally recorded in July of 1979. Contains original commercial blocks and DJ introductions by Herman. Side D is blank.

Complete track listing can be found here:

KBFH #BOB 309 Conversation With Bob Seger on Discogs

The Rolling Stones

King Biscuit Flower Hour #KB 312 (Elvis Costello Label Misprint):

D.I.R. Broadcasting Records

Unknown recording date

Original Broadcast –
Week of 27 April 1980

pre-FM Double Vinyl LP

King Biscuit captured The Stones on two of their North American tours for this double vinyl release. As with most Biscuit shows, Side D is blank. The labels for this set were misprinted, identifying the artist as Elvis Costello & The Attractions. D.I.R. Broadcasting had to therefore apologize that the label was printed in error and that the label should read ‘The Rolling Stones.’ Because of this misprint, this set is extremely valuable and hard to find. My copy did not come with any of the original paperwork, which can be seen in the Discogs listing.

Complete track listing can be found here:

KBFH #KB 312 on Discogs

Eric Clapton

B.B.C. Rock Hour #127 
The Eric Clapton Special (Version AA):

London Wavelength Records

Unknown recording date

Original Broadcast –
Week of 6 July 1980

pre-FM Double Vinyl LP

Host Richard Skinner presents an interview with Eric Clapton regarding his live album JUST ONE NIGHT. Tommy Vance conducts the interview and plays live cuts from that album, along with other Clapton-related tracks. All of the live tracks are taken from the aforementioned live release. Contains original commercial blocks and DJ introductions. This is Version AA per the Matrix / Runouts.

Complete track listing can be found here:

B.B.C. Rock Hour #127 AA on Discogs

Genesis

The Source – Live at The Lyceum:

NBC Young Adult Network Records

Recorded Live at The Lyceum Ballroom
London, England:
7 May 1980

Original Broadcast –
Week of 18 July 1980

pre-FM Double Vinyl LP

This historic Lyceum 7 May 1980 concert had air time in the U.S. courtesy of The Source, a program put out by NBC since 1979, distributed via radio show LPs. Seventy minutes of the live Genesis are supplemented with the usual announcements and adverts. The venue is mistakenly identified as Drury Lane Theatre. Note: Follow You, Follow Me from this show was used on the official release THREE SIDES LIVE.

Complete track listing can be found here:

The Source on Discogs

The Rolling Stones

King Biscuit Flower Hour Presents – Radio Meets The Rolling Stones #KB 325:

D.I.R. Broadcasting Records

Unknown recording date

Original Broadcast –
Week of 27 July 1980

pre-FM Double Vinyl LP

New York radio disc jockey Scott Muni leads a “round table” discussion with several well known disc jockeys from across the United States and the members of The Rolling Stones for a King Biscuit Flower Hour 90 minute radio special. As with the above listed A CONVERSATION WITH BOB SEGER show, this is also not a live concert recording. The disc jockeys present are Mark Parenteau from WBCN in Boston, (who was later sentenced to three years in federal prison for sexual child abuse, and who passed away in 2016), Norm Winer from WXRT in Chicago (who quit being a DJ in 2016 after 37 years at WXRT), Tempi Lindsey from KTXQ in Dallas, Jack Snyder from KMET in Los Angeles and Charlie Kendall from WMMR in Philadelphia (who later appeared as a regular host of Westwood One’s Superstar Concert Series). The entire group met at the WNEW studios in New York, where they all sat around a table drinking, smoking, telling stories and asking / answering questions from the various DJs. Some questions from “fans” are also presented, but no call-in audience members are present. One can actually hear cigarette lighters clicking, beer cans popping open and being poured, and glasses clinking throughout the show. Tracks from the most recent Stones album at the time, EMOTIONAL RESCUE, were also featured during the show. Original commercial blocks are also included.

Complete track listing can be found here:

KBFH #KB 325 Radio Meets The Rolling Stones on Discogs

Eddie Money /
Warren Zevon

King Biscuit Flower Hour #KB 336:

D.I.R. Broadcasting Records

Recorded live at The Kiel Opera House,
St. Louis, Missouri: Unknown Month / Day 1980
&
The Tower Theatre, Philadelphia, Pennsylvania:
22 April 1980

Original Broadcast –
Week of 12 October 1980

pre-FM Double Vinyl LP

A double bill King Biscuit show from 1980, this show combines performances from Eddie Money and Warren Zevon. The date of the Money show is unknown (Wolfgang’s Vault lists it as 12 October 1980, however, this is actually the original broadcast date of the double LP show), while Zevon’s performance is from April of that year.  Contains original commercial blocks and intros by King Biscuit regular contributor Bill Minkin. From my personal collection.

Complete track listing can be found here:

KBFH #KB 336 on Discogs

Tom Petty And The Heartbreakers

King Biscuit Flower Hour Best Of The Biscuit #BOB 339:

D.I.R. Broadcasting Records

Recorded Live at The Hammersmith Odeon, London, England:
7 March 1980

Original Broadcast –
Week of 2 November 1980

pre-FM Double Vinyl LP

Tom Petty And the Heartbreakers were on the road for their 1979 breakthrough album, DAMN THE TORPEDOES, when they recorded a handful of shows between 1979 and 1980 for the King Biscuit Flower Hour. These three sides capture one of those shows recorded at London’s Hammersmith Odeon on 7 March 1980. There were multiple versions of this show released on vinyl and compact disc over the years, as can be seen via the below link.

Complete track listing can be found here:

KBFH #BOB 339 on Discogs

The Eagles

Spotlight Special Presents: The Eagles #SLS 102:

ABC Radio Networks Records

Unknown recording date

Original Broadcast –
Unknown Month / Day 1980

pre-FM Double Vinyl LP

A two-hour radio show featuring interviews, songs and historical notes about the band. Host Kris Erik Stevens, an ABC Radio Networks DJ for many years, provides historical notes between the interview segments and songs. Includes interviews with Don Henley, Glenn Frey, Don Felder, Joe Walsh, Jackson Browne, Bob Seger and Elektra / Asylum Records Chairman of the Board Joe Smith. No commercials are included on this set, and unlike most radio shows on vinyl, this set has Sides A and B on one LP, along with Sides C and D on the second LP. (Usually double LP radio shows were set up as Sides A and C on one LP, and Sides B and D on the second LP to allow DJs to play the sides continuously.) Note that Side B does not contain the 700 Hz Tone Locked Groove used for balancing the audio levels prior to broadcast, but Sides A, C and D do. (Side D actually has two such “tones”, one at the beginning of the side and one prior to the Promo spots.)

Complete track listing can be found here:

Spotlight Special on Discogs

Tom Petty

Inside Tom Petty #CTP-1:

D.I.R. Broadcasting Records

Unknown recording date

Original Broadcast –
Unknown Day, May 1981

pre-FM Triple Vinyl LP

A one-off, triple LP, two-hour radio special featuring interviews and music with Tom Petty. Released to coincide with his 1981 release HARD PROMISES, this special features host and interviewer Jack Snyder speaking with Petty in person about his musical influences, his career up to that point, and the aforementioned album. Lots of album tracks and in-depth discussion between Petty and Snyder, who appear together.

A track listing that leaves a lot to be desired can be found here:

Inside Tom Petty on Discogs

Dire Straits / Loverboy

King Biscuit Flower Hour  Best Of The Biscuit
#KB / BOB 374:

D.I.R. Broadcasting Records

Recorded Live at Old Waldorf, San Francisco, California: 31 March 1979
&
Vancouver Coliseum, Vancouver, British  Columbia: 3 August 1980

Original Broadcast –
Week of 5 July 1981

pre-FM Double Vinyl LP

A double-bill King Biscuit show with segments previously aired on radio stations across the U.S. The venues for each performance are not specifically mentioned by regular contributor and host Bill Minkin. He does, however, mention the cities for each show. A little investigating reveals that the Dire Straits portion was recorded at The Old Waldorf during their first tour of the States. The Loverboy segment was most likely recorded at the Vancouver Coliseum (later renamed the Pacific Coliseum) on 3 August 1980. Contains original commercial blocks and two sections of extended silence for local station announcements.

Complete track listing can be found here:

KBFH #KB / BOB 374 on Discogs

Keith Richards

Off The Record Specials With Mary Turner #81-21:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 26 October 1981

pre-FM Double Vinyl LP

Another in the Off The Record Specials series of shows. Mary Turner presents an interview with Keith Richards in a two part show; Part I of which is featured on this two LP set. (Part II is listed as show #81-22, and can be found below.) The discussion centers on The Rolling Stones formation and early years.

Commercial blocks and studio tracks are mixed with conversations between Richards and Turner,   although the two do not appear in the studio together. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #81-21 on Discogs

 

The Rolling Stones

Super Groups – Rolling Stones ’81 #SG 006:

D.I.R. Broadcasting Records

Recorded Live at Various Locations: XX-XX-1981

Original Broadcast –
Week of 31 October 1981

pre-FM Triple Vinyl LP

This radio show is a mix of live cuts, interview segments and studio tracks featuring The Rolling Stones, who went out on the road in September of 1981 in support of the album TATTOO YOU. (This was to be the last tour of the United States the Stones would do until 1989.) This set was therefore released to U.S. radio stations to promote the tour. D.I.R., who produced the show in association with ABC Radio Networks, are the people behind King Biscuit. Most of the live tracks on this set were not recorded during the 1981 tour, however, these tracks were culled from previous shows recorded by D.I.R. Several of the concerts throughout the tour were captured and selected songs were released on the 1982 live album STILL LIFE (AMERICAN CONCERT 1981).

Complete track listing can be found here:

Super Groups Rolling Stones ’81 on Discogs

Keith Richards

Off The Record Specials With Mary Turner #81-22:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 2 November 1981

pre-FM Double Vinyl LP

Turner continues her discussion with Keith Richards in this two part show; Part II of which is featured on this two LP set. (Part I is listed as show #81-21, and can be found above.) The discussion centers on the success of The Rolling Stones, Brian Jones’ death, writing with Mick Jagger and the inception of The Glimmer Twins.

Commercial blocks and studio tracks are mixed with conversations between Richards and Turner, again mixed to sound as if they appear in the studio together. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #81-22 on Discogs

Red Rider

B.B.C. Rock Hour #246:

London Wavelength Records

Recorded Live in Cincinnati, Ohio:
Unknown Date

Original Broadcast –
Week of 15 November 1981

pre-FM Single Vinyl LP

This radio special features a live performance from Red Rider captured in Cincinnati, Ohio, although the venue and date are never mentioned. Hosted by Mark Parenteau and containing original commercial blocks.

Complete track listing can be found here:

B.B.C. Rock Hour #246 on Discogs

Genesis

B.B.C. Rock Hour Special – Best Of Rock Hour #304 (Version B):

London Wavelength Records

Recorded Live at Knebworth Park, Stevenage, England:
24 June 1978

Original Broadcast –
Week of 24 January 1982

pre-FM Single Vinyl LP

U.S. radio transcription disc featuring highlights from Genesis’ performance at the 1978 Knebworth Festival, which was the band’s only European appearance on their tour in support of the album ... AND THEN THERE WERE THREE… Note that the final track is only listed as Los Endos on the Cue Sheet, however, the complete track listing is Dance On A Volcano / Drum Duet / Los Endos. This is Version B of this release.

Complete track listing can be found here:

B.B.C. Rock Hour #304 Version B on Discogs

Genesis

Super Groups In Concert #SGY-7:

ABC Rock Radio Networks Records

Recorded Live at The Nassau Coliseum
Long Island, New York:
29 November 1981

Original Broadcast –
Week of 10 April 1982

pre-FM Triple Vinyl LP

Yellow Mello Yello Label Version

This radio show is the first of many versions of the set from the Nassau Coliseum in 1981 that I own. It is also the most complete set from the Nassau Coliseum concert, with the only significant omission being Turn It On Again, found on other Westwood One radio shows and the THREE SIDES LIVE album and video. 

Dodo / Lurker, Abacab, Misunderstanding, Turn It On Again, Follow You, Follow Me, the In The Cage Medley and Behind The Lines can all be found on the THREE SIDES LIVE official live album ad video release. Partially recorded at The Nassau Coliseum in New York on 29 November 1981, (with the exception of Man On The Corner, No Reply At All and probably Misunderstanding which were most likely captured at The Savoy Club in New York City on 28 November 1981). Behind The Lines usually segued directly into Duchess when performed live, (and indeed it does so on THREE SIDES LIVE) however, this recording utilizes a quick fade out as Duchess begins and the song slips directly into No Reply At All. Lastly, Follow You, Follow Me was recorded at the Lyceum Ballroom in London on 7 May 1980.

Another version of this same set was pressed with green labels and sponsored by Sprite soda instead of Mello Yello. That show is listed directly below. 

Complete track listing can be found here:

Super Groups Genesis #SGY-7 on Discogs

Genesis

Super Groups In Concert #SGS-7:

ABC Rock Radio Networks Records

Recorded Live at The Nassau Coliseum
Long Island, New York:
29 November 1981

Original Broadcast –
Week of 10 April 1982

pre-FM Triple Vinyl LP

Green Sprite Label Version

Identical show as the set that was pressed with yellow labels and sponsored by Mello Yello; listed directly above. 

Complete track listing can be found here:

Super Groups Genesis #SGS-7 on Discogs

The Rolling Stones

Off The Record Specials With Mary Turner Part I #82-15:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 12 April 1982

pre-FM Double Vinyl LP

Another in the Off The Record Specials series of shows. Mary Turner presents an interview with Mick Jagger and Ron Wood of The Rolling Stones for this radio special. This is a two part show, with this entry containing Part I. Part II aired one week later, on 19 April 1982, contained interviews with all of the band members, and can be found below.

The discussion centers on recording in various locations, fame, and the band’s latest album (at the time) TATTOO YOU.

Commercial blocks and studio tracks are mixed with conversations between Turner and the two band members, mixed to sound as if they appear in the studio together. There are several tracks which do not appear on the Cue Sheet. In addition, the running order of the commercials in tracks B8 and C12 are incorrect on the Cue Sheet. 

Complete track listing can be found here:

OTRSP #82-15 on Discogs

Billy Squire

King Biscuit Flower Hour #KB 415:

D.I.R. Broadcasting Records

Recorded Live at the Santa Monica Civic Auditorium, Santa Monica, California:
20 November 1981

Original Broadcast –
Week of 18 April 1982

pre-FM Double Vinyl LP

King Biscuit radio show featuring Billy Squire captured live during the tour promoting his 1981 release DON’T SAY NO. The show features original commercial blocks and DJ introductions by King Biscuit regular contributor Bill Minkin. As usual, Side D is blank.

Complete track listing can be found here:

KBFH Billy Squire on Discogs

The Rolling Stones

Off The Record Specials With Mary Turner Part II #82-16:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 19 April 1982

pre-FM Double Vinyl LP

Turner continues her discussion with Mick Jagger and Ron Wood of The Rolling Stones, and in addition,  Keith Richards and Bill Wyman join the conversation. This is a two part show, with this entry containing Part II. Part I aired one week earlier, on 12 April 1982, contained interviews with just Mick Jagger and Ron Wood only, and can be found above. The discussion centers on the band’s formation, early years and current work.

Commercial blocks and studio tracks are mixed with conversations between Turner and all of the band members. Midway through the last side (Track D5) host Mary Turner plays a long montage of classic Stones tracks as a means of catching the listener up on all the hits. This track leads into the End Credits.

Complete track listing can be found here:

OTRSP #82-16 on Discogs

Genesis

King Biscuit Flower Hour #KB 424:

D.I.R. Broadcasting Records

Recorded Live at The Nassau Coliseum
Long Island, New York:
29 November 1981

Original Broadcast –
Week of 20 June 1982

pre-FM Double Vinyl LP

Another version of the famous Nassau Coliseum show from Genesis. The show features original commercial blocks and DJ introductions by King Biscuit regular contributor Bill Minkin. As usual, Side D is blank.

Complete track listing can be found here:

KBFH Genesis #KB 424 on Discogs

Journey

King Biscuit Flower Hour #KB 428:

D.I.R. Broadcasting Records

Recorded Live at The Summit, Houston, Texas:
6 November 1981

Original Broadcast –
Week of 18 July 1982

pre-FM Double Vinyl LP

King Biscuit radio show featuring Journey captured live during the tour promoting their 1982 release FRONTIERS. The show features original commercial blocks and DJ introductions by King Biscuit regular contributor Bill Minkin. As usual, Side D is blank.

Complete track listing can be found here:

KBFH Journey #KB 428 on Discogs

Genesis

Westwood One In Concert #IC 82-19 X:

Westwood One Radio Networks Records

Recorded Live at The Nassau Coliseum
Long Island, New York:
29 November 1981

Original Broadcast –
Week of 13 September 1982

pre-FM Double Vinyl LP

This is the third version of this show that I own on vinyl. The host for this exact show is unknown as he never identifies himself during the show. Though slightly fewer tracks are present on this version as opposed to the above listed Super Groups In Concert version (Firth Of Fifth and Me And Sarah Jane do not appear on this version), it is still essentially the same show.

Complete track listing can be found here:

In Concert Genesis #IC 82-19 X on Discogs

Dire Straits

B.B.C. Rock Hour Special #345 (Version A):

London Wavelength Records

Unknown recording date

Original Broadcast –
Week of 7 November 1982

pre-FM Single Vinyl LP

U.S. radio transcription disc in which Host Richard Skinner presents an interview with Mark Knopfler regarding Dire Straits’ fourth album, LOVE OVER GOLD. Tracks from the album are included along with commercial blocks, while Interviewer Tommy Vance and Knopfler appear in the studio together. This is Version A of this release.

Complete track listing can be found here:

B.B.C. Rock Hour #345 A on Discogs

Billy Joel

The Billy Joel Special:
The Man And His Music
#L- 11908:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 29 November 1982

pre-FM Double Vinyl LP

Host Dave Herman interviews Billy Joel at his home in Long Island for this radio broadcast special encompassing his entire career up to his latest release (at the time) THE NYLON CURTAIN. Commercial blocks and studio tracks are mixed with conversations between Joel and Herman, who appear together. The break down of segments is as follows:

Record One: Sides A & C
Side A: Segments 1 & 2
Side C: Segments 5 & 6
Record Two: Sides B & D
Side B: Segments 3 & 4
Side D: Segments 7 & 8

Complete track listing can be found here:

Billy Joel The Man & His Music on Discogs

John Cougar Mellencamp, Quarterflash, Foreigner, Journey, Genesis, Pat Benatar, Aldo Nova, Loverboy, Novo Combo & Billy Squire

The King Biscuit Flower Hour 1982 Year End Special
#KB 451:

ABC Rock Radio Networks Records

Recorded live at Various Locations / Dates

Original Broadcast –
Week of 26 December 1982

pre-FM Double Vinyl LP

Host Bill  Minkin presents the Biscuit’s yearly wrap-up show, set for broadcast at the end of 1982. Several artists are featured, including Genesis. 

Complete track listing can be found here:

KBFH # KB 451 on Discogs

The Rolling Stones

Super Groups In Concert 1983 #SG 19:

D.I.R. Broadcasting Records

Recorded Live at Various Locations: XX-XX-1981

Original Broadcast –
Week of 19 March 1983

pre-FM Triple Vinyl LP

U.S. radio transcription disc consisting of multiple live tracks, all culled from The Stones 1981 American Tour in support of their album TATTOO YOU. (This was to be the last tour of the United States The Stones would do until 1989.) Contains original commercial blocks and DJ introductions by Pat St. John.

The tracks were recorded at the following locations:

Side A: The Pontiac Superdome, Detroit, Michigan – 30 November & 1 December 1981
Side B: Rosemont Horizon, Chicago, Illinois – 23 November 1981
Side C: Superdome, New Orleans, Louisiana – 5 December 1981
Side D: Sun Devil Stadium, Tempe, Arizona – 13 December 1981
Side E & F: The Capital Centre Arena, Largo, Maryland (just outside Washington, D.C.) – 7 December 1981

Complete track listing can be found here:

Super Groups In Concert 1983 on Discogs

Men At Work

CARGO: World Premier Weekend #A2S 1650:

Columbia Records

Unknown recording date

Original Broadcast –
Week of 15 – 17 April 1983

pre-FM Double Vinyl LP

This is an official release from Columbia Records celebrating the release of Men At Work’s second album CARGO. The first of the two LPs features music from the album, while the second features band members discussing the tracks.

Complete track listing can be found here:

CARGO World Premier Weekend on Discogs

Pete Townshend

Off The Record Specials With Mary Turner #83-18:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 25 April 1983

pre-FM Double Vinyl LP

Another in the Off The Record Specials series of shows. Mary Turner presents an interview with guitar great Pete Townshend about his musical roots, his solo work and his work with The Who.

Original commercial blocks are included along with tracks from Townshend’s solo albums and a few tracks by The Who.

Complete track listing can be found here:

OTRSP #83-18 on Discogs

Greg Kihn Band

Westwood One In Concert #P83-15:

Westwood One Radio Networks Records

Recorded Live at Six Flags Magic Mountain, Valencia, California:
19 March 1983

Original Broadcast –
Week of 2 May 1983

pre-FM Double Vinyl LP

The Greg Kihn Band was captured by Westwood One for this one hour radio concert special. There are several more shows from the In Concert series listed below. Hosted by Westwood One regular contributor Phil Hendrie, and featuring original commercial blocks. Released on translucent virgin purple vinyl.

Complete track listing can be found here:

Greg Kihn In Concert 1983 on Discogs

Robert Plant

Off The Record Specials With Mary Turner #83-31:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 25 July 1983

pre-FM Double Vinyl LP

Another in the Off The Record Specials series of shows. Mary Turner presents an interview with Robert Plant about his time with Led Zeppelin, playing live, and his latest album (at that time) THE PRINCIPLE OF MOMENTS. Includes studio tracks from several other albums and original commercial blocks. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #83-31 on Discogs

Genesis

Superstar Concert Series #SS 83-5:

Westwood One Radio Networks Records

Recorded Live at The Nassau Coliseum
Long Island, New York:
29 November 1981

Original Broadcast –
Week of 29 July 1983

pre-FM Triple Vinyl LP

This radio show is another version of the concert from the Nassau Coliseum, similar to the above listed In Concert #IC 82-19 X from September 1982. Hosted by DJ David Perry and containing original commercial blocks for Sprite and Coke sodas.  Although SS 83-5 does not appear on the LP labels, it does appear etched in the Matrix / Runouts on each LP. This is also the last version of this show that I own on vinyl. I do have a few versions on compact disc, which are listed below.

Complete track listing can be found here:

SCS #SS 83-5 on Discogs

The Police

Off The Record Specials With Mary Turner #83-39:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 19 September 1983

pre-FM Double Vinyl LP

Another in the Off The Record Specials series of shows. Mary Turner presents an interview with Andy Summers about his time with The Police, their huge worldwide success and playing live in venues that other bands had not played in. Stewart Copeland and Sting do not appear on this special, and – as usual – Turner and Summers do not appear together in the studio. Includes studio tracks from several Police albums and original commercial blocks. Released on translucent vinyl. From my personal collection.

Complete track listing can be found here:

OTRSP #83-39 on Discogs

Dire Straits

King Biscuit Flower Hour
The Prince’s Trust Fund Rock Gala #KB 502:

D.I.R. Broadcasting Records

Recorded Live at Hammersmith Odeon, London, England:
22 – 23 July 1983

Original Broadcast –
Week of 18 December 1983

pre-FM Double Vinyl LP

This radio show contains a concert performance recorded for The Prince’s Trust Fund Rock Gala in July of 1983 at London’s  Hammersmith Odeon. (Someone on Discogs has incorrectly changed the venue to The Dominion Theatre with no explanation as to why.) All of the tracks were repackaged for broadcast in November 1984 for a Best Of The Biscuit special. This show is listed below. A few of these tracks also turned up on the King Biscuit Flower Hour: Dire Straits – A Retrospective show from August 1986. That show is also listed below. Finally, these tracks also appear on the official release ALCHEMY – DIRE STRAITS LIVE. Contains original commercial blocks and DJ introductions from King Biscuit regular contributor Bill Minkin.

Complete track listing can be found here:

KBFH #KB 502 on Discogs

U2

Off The Record Specials With Mary Turner #84-01:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 26 December 1983

pre-FM Double Vinyl LP

Another in the Off The Record Specials series of shows. Mary Turner presents an interview with  Adam Clayton about his musical career, touring, and the band’s latest album (at that time) WAR. Includes live tracks from the UNDER A BLOOD RED SKY album, along with studio tracks from several other albums and original commercial blocks. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #84-01 on Discogs

Bob Seger

Off The Record Specials With Mary Turner #84-03:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 9 January 1984

pre-FM Double Vinyl LP

Another in the Off The Record Specials series of shows. Mary Turner presents an interview with Bob Seger about his musical career, touring, his admiration of John Lennon and his latest album (at that time) THE DISTANCE. Includes live tracks from the LIVE BULLET and NINE TONIGHT albums, along with studio tracks from several Seger albums and original commercial blocks. This is Part II of a two part set of shows. Part I was released under show #84-02, but I do not own a copy of that show. Released on translucent virgin purple vinyl.

Complete track listing can be found here:

OTRSP #84-03 on Discogs

Dire Straits

B.B.C. Rock Hour Special #512 (Version A):

London Wavelength Records

Unknown recording date

Original Broadcast –
Week of 18 March 1984

pre-FM Single Vinyl LP

U.S. radio transcription disc in which Host Richard Skinner interviews Mark Knopfler regarding Dire Straits’ first live concert album, ALCHEMY – DIRE STRAITS LIVE. Tracks from the double album are included along with commercial blocks, while Skinner and Knopfler appear in the studio together. All of the Straits tracks were recorded live in concert at Hammersmith Odeon in London on 22–23 July 1983, and appear on the aforementioned album. The show also contains one studio track from Bob Dylan’s 1983 album INFIDELS, which Knopfler produced and performed on. This is Version A of this release.

Complete track listing can be found here:

B.B.C Rock Hour #512 A on Discogs

Genesis

Superstar Concert Series #SS 84-5:

Westwood One Radio Networks Records

Recorded Live at The Forum, Los Angeles, California:
13 – 14 January 1984

Original Broadcast –
Week of 21 April 1984

pre-FM Triple Vinyl LP

In January 1984, during the Mama Tour, Genesis played at the L.A. Forum for three nights commencing on 12 January 1984. Portions of these shows were recorded by Westwood One and sent to radio stations in the U.S for broadcast in April of that year. During this particular show, Phil says “It’s Saturday night and we’re going to have some fun…” pinpointing the 14th as one of the nights used for this recording. Illegal Alien and It’s Gonna Get Better from 14 January show have turned up on the ARCHIVE #2 1976-1992 box set, however, since the version of It’s Gonna Get Better on this set differs from that of Archive box set, we now know that the radio show version is from 13 January. So this set contains songs recorded on at least two separate nights in L.A. Westwood One regular contributor Phil Hendrie handles the hosting duties on this show. This exact set was repackaged by Westwood One for broadcast in October of 1984 under #PAN 84-2, listed below.

Complete track listing can be found here:

SCS #SS 84-5 on Discogs

David Gilmour

Off The Record Specials With Mary Turner #84-18:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 23 April 1984

pre-FM Double Vinyl LP

Another in the Off The Record Specials series of shows. Mary Turner presents an interview with David Gilmour about his musical career, playing with Pink Floyd and his latest solo album (at that time) ABOUT FACE. Includes original commercial blocks and DJ intros by Westwood One regular contributor Phil Hendrie. One of the more rare OTRSP shows, and a prized possession. Released on translucent virgin purple vinyl.

Complete track listing can be found here:

OTRSP #84-18 on Discogs

Eric Clapton, Jeff Beck, Steve Winwood, Jimmy Page & Various Artists

Superstar Concert Series #SS 84-B:

Westwood One Radio Networks Records

Recorded Live at The Royal Albert Hall, London, England:
20 September 1983

Original Broadcast –
Week of 7 May 1984

pre-FM Triple Vinyl LP

Westwood One captured the one-off Ronnie Lane / A.R.M.S. Benefit Concert at the Royal Albert Hall in September of 1983.  The show featured multiple artists, including drummers Charlie Watts, Simon Phillips and Kenny Jones, guitarist Andy Fairweather-Low, bassist Bill Wyman, pianist Chris Stainton and percussionist Ray Cooper. The concert was billed as The Ronnie Lane Appeal for A.R.M.S. (Action into Research for Multiple Sclerosis). From my personal collection.

Complete track listing can be found here:

SCS # 84-B on Discogs

Genesis

King Biscuit Flower Hour – The Mama Tour Two Part Special #KB 524 / 525:

D.I.R. Broadcasting Records

Recorded Live at The Spectrum, Philadelphia, Pennsylvania:
27 November 1983

Original Broadcast –
Part I: 20 May 1984
Part II: 27 May 1984

pre-FM Quadruple Vinyl LP

This is the first of four Mama Tour shows recorded at The Spectrum in Philadelphia, Pennsylvania that I have in my collection. 

On their hugely successful Mama Tour, Genesis played three consecutive nights at The Spectrum in Philadelphia, Pennsylvania; 25 – 27 November 1983. The third night was recorded by King Biscuit, with 110 minutes of this concert having been broadcast by King Biscuit over two consecutive Flower Hour shows on consecutive weekends in May of 1984. The material is certainly different from the CAPTURED LIVE! recording sourced from the previous night, 26 November. (That show is listed below.) The mix on this show is a little heavier on bass and audience noise, making for a fuller experience. A shortened version of this show was also broadcast by King Biscuit in September of 1984 as a Best Of show, listed below.

Complete track listing can be found here:

KBFH Genesis Two Part Special #KB 524 / 525 on Discogs

The Pretenders

Superstar Concert Series #SS 84-7:

Westwood One Radio Networks Records

Recorded Live at The Universal Amphitheatre,
Universal City, Los Angeles, California:
7 – 9 March 1984

Original Broadcast –
Week of 2 June 1984

pre-FM Triple Vinyl LP

Another entry in the Superstar Concert Series of shows, this time featuring The Pretenders. Hosted by Westwood One regular contributor Phil Hendrie, and featuring original commercial blocks. This show was released on virgin purple translucent vinyl. 

Complete track listing can be found here:

SCS # SS84-7 on Discogs

Genesis

CAPTURED LIVE!
#CL 2684 / 2784:

RKO Radio Networks Records

Recorded Live at The Spectrum, Philadelphia, Pennsylvania:
26 November 1983

Original Broadcast –
Part I: 23 July 1984
Part II: 30 July 1984

pre-FM Quadruple Vinyl LP

Radio show producers RKO recorded 100 minutes from the second of the three 1983 dates at this venue for broadcast as part of their CAPTURED LIVE! series. This show aired over two consecutive weekends on U.S. radio stations, with DJ Jim Ladd hosting and no commercial blocks presented on the vinyl itself.

The running order of the songs gets jumbled at the end, with RKO choosing to place Misunderstanding and Illegal Alien after the show’s actual closer, Turn It On Again, thus creating a false encore. Presented on translucent vinyl. These transcription LPs are very hard to find.

Complete track listing can be found here:

Captured Live! #CL 3684 / 2784 on Discogs

David Gilmour

Westwood One In Concert #IC 84-18:

Westwood One Radio Networks Records

Recorded Live at The Stabler Arena, Bethlehem, Pennsylvania:
12 July 1984

Original Broadcast –
Week of 31 August 1984

pre-FM Double Vinyl LP

Westwood One captured Gilmour in Philadelphia, PA on tour in support of his second solo effort, ABOUT FACE. Phil Hendrie takes over hosting duties once again, and original commercial blocks are included. This is a super-rare and hard to find release.

Complete track listing can be found here:

In Concert # IC 84-18 on Discogs

Genesis

King Biscuit Flower Hour – The Best Of The Biscuit #BOB 543:

D.I.R. Broadcasting Records

Recorded Live at The Spectrum, Philadelphia, Pennsylvania:
27 November 1983

Original Broadcast –
30 September 1984

pre-FM Double Vinyl LP

This is the Best Of show featuring the Genesis performance from The Spectrum, which originally aired over two consecutive weekends in May 1984, which is listed above. Obviously a shortened version, this time on two LPs rather than four.

Complete track listing can be found here:

KBFH Best Of #KB 543 on Discogs

Genesis

Superstar Concert Series #PAN 84-2:

Westwood One Radio Networks Records

Recorded Live at The Forum, Los Angeles, California:
13 – 14 January 1984

Original Broadcast –
Week of 20 October 1984

pre-FM Triple Vinyl LP

Exact same show as #SS 84-5, repackaged for broadcast in October of ’84 rather than April of that year. DJ Phil Hendrie hosts both shows with the only difference being the commercials presented and the labels on the discs themselves.

Complete track listing can be found here:

SCS #PAN 84-2 on Discogs

Lindsey Buckingham

B.B.C. Rock Hour
#543 (Version B):

London Wavelength Records

Unknown recording date

Original Broadcast –
Week of 20 October 1984

pre-FM Single Vinyl LP

Host John Platt interviews Lindsey Buckingham about his musical career, his time with Fleetwood Mac, dating Stevie Nicks and his latest solo album (at that time) GO INSANE. Includes original commercials and DJ introductions by Platt. This show is almost identical to B.B.C. Rock Hour # 543 (Version A), but this is Version B, and as such contains slightly different commercial blocks. The songs played and the interview segments are identical on both releases. Platt and Buckingham appear to sound (at times) as if they are in the studio together. This is Version B of this release.

Complete track listing can be found here:

B.B.C. Rock Hour #543 B on Discogs

John Mellencamp

Off The Record Specials With Mary Turner #84-44:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 27 October 1984

pre-FM Double Vinyl LP

Another in the Off The Record Specials series of shows. Mary Turner presents an interview with John Mellencamp about his early years and current work up to his latest release (at that time) UH-HUH.

Commercial blocks and studio tracks are mixed with conversations between Turner and Mellencamp mixed to sound as if they appear in the studio together. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #84-44 on Discogs

Dire Straits

King Biscuit Flower Hour Best Of The Biscuit
#BOB 548:

D.I.R. Broadcasting Records

Recorded Live at Hammersmith Odeon, London, England:
22 – 23 July 1983

Original Broadcast –
Week of 4 November 1984

pre-FM Double Vinyl LP

Another Best Of show from King Biscuit, this time repeating the show from December 1983 entitled The Prince’s Trust Fund Rock Gala starring Dire Straits. Same is listed above. A few of these tracks also turned up on the King Biscuit Flower Hour: Dire Straits – A Retrospective show from August 1986. That show is also listed below. Finally, these tracks also appear on the official release ALCHEMY – DIRE STRAITS LIVE. Original commercial blocks and the usual host, Bill Minkin, are all present on this set.

Complete track listing can be found here:

KBFH #BOB 548 Discogs

Genesis

CAPTURED LIVE!
#CL 4184:

RKO Radio Networks Records

Recorded Live at The Spectrum, Philadelphia, Pennsylvania:
26 November 1983

Original Broadcast –
5 November 1984

pre-FM Double Vinyl LP

After RKO produced the quadruple LP, two consecutive weekend broadcast of this show back in July of the same year, they then put out an abbreviated two LP edition concentrating mainly on the hits. This double LP set was presented on translucent vinyl and – for a change – did contain commercial blocks. Jim Ladd hosted this show as well, and, as with the two-part presentation, the running order of the songs gets jumbled at the end, with RKO again choosing to place Misunderstanding and Illegal Alien after the show actual closer, Turn It On Again, thus creating a false encore.

Complete track listing can be found here:

Captured Live! #CL 4184 on Discogs

John Mellencamp

Superstar Concert Series #PAN 84-3:

Westwood One Radio Networks Records

Recorded Live at Indiana University Auditorium
Bloomington, Indiana:
10 April 1984

Original Broadcast –
Week of 10 November 1984

pre-FM Triple Vinyl LP

Westwood One concert featuring John Mellencamp during his 1984 tour. Featuring original commercials and DJ introductions by Westwood One regular contributor Phil Hendrie.

Complete track listing can be found here:

SCS #PAN 84-3on Discogs

Bryan Adams

Off The Record Specials With Mary Turner #85-01:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 31 December 1984

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Bryan Adams. The discussion centers on Adams’ early years and current work up to his latest release (at that time) RECKLESS. Commercial blocks and studio tracks are mixed with conversations between Turner and Adams, mixed to sound as if they appear in the studio together. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #85-01 on Discogs

Russ Ballard

A Portrait Of An Artist By Mary Turner #SPRO-9100 / 9101:

EMI America Records

Unknown recording date

Original Broadcast –
Unknown Month / Day 1984

pre-FM Single Vinyl LP

This is another official release, this time from EMI America Records. This special promotional LP details Russ Ballard’s self titled 1984 release.

Side A is an audio-documentary of Russ Ballard’s career, narrated by Mary Turner, of Off The Record Special fame, interspersed with snippets of several of his compositions, in this order:

Unit Four Plus Two – Concrete And Clay
Three Dog Night – Liar
Argent – Hold Your Head Up
Roger Daltrey – Come And Get Your Love
Ace Frehley – New York Groove
Rainbow – Since You’ve Been Gone
The London Symphony Orchestra – Since You’ve Been Gone
Santana – Winning
Roger Daltrey – Free Me
Frida – I Know There’s Something Going On

Side B features two tracks from the aforementioned album, however, Track B1 is the Radio Edit version rather than the full length song.

Complete track listing can be found here:

Russ Ballard Portrait on Discogs

U2

Off The Record Specials With Mary Turner #85-05:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
28 February 1985

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Adam Clayton and The Edge about the band’s politics, touring and their latest album (at that time) THE UNFORGETTABLE FIRE. Includes live tracks from the UNDER A BLOOD RED SKY album, along with studio tracks from several other albums and original commercial blocks. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #85-05 on Discogs

Bruce Springsteen

A Conversation With Bruce Springsteen #BSS 85-1:

Westwood One Radio Networks Records

Recorded in Hartford, Connecticut: XX-XX-1985

Original Broadcast –
Week of 29 April 1985

pre-FM Triple Vinyl LP

Westwood One London Correspondent Roger Scott interviews The Boss in person during his 1985 Born In The U.S.A. tour for this radio broadcast special. The conversation takes place, as Scott points out at the very beginning of the show, “at two AM on a Sunday morning after a show in Hartford, Connecticut…” and encompasses Springsteen’s entire career up to his latest release (at the time) BORN IN THE U.S.A.. Original commercial blocks are mixed with tracks by Springsteen and The E Street Band, along with the interview segments. Westwood One regular contributor Phil Hendrie handles the hosting duties, and as such, sets up the intros and segment breaks. Portions of this interview special can also be heard on the BORN IN THE USA SPECIAL, listed below. According to Discogs, there is an earlier broadcast version of this show from December ’84; my copy is from April ’85.

Complete track listing can be found here:

A Conversation With Bruce Springsteen on Discogs

Bryan Adams, Los Lobos, Van Morrison, Guiffria, George Thorogood & The Delaware Destroyers

King Biscuit Flower Hour On Tour This Month
#KB 575:

D.I.R. Broadcasting Records

Unknown recording date

Original Broadcast –
Week of 12 May 1985

pre-FM Double Vinyl LP

This King Biscuit entry is a compilation of several artists who were all on the road the year / month the show was broadcast. King Biscuit regular contributor Bill Minkin handles the hosting duties for this show. There were several such entries from the folks at King Biscuit, and I have a few in my collection. This show is not currently listed on Discogs, therefore, I will detail the contents here:

George Thorogood & The Delaware Destroyers: I Drink Alone, Bad To The Bone, Gear Jammer

Los Lobos: Will The Wolf Survive?, Don’t Worry Baby

Van Morrison: Moondance, Wavelength

Guiffria: Do Me Right Tonight, Call To The Heart

Bryan Adams: This Time, Cuts Like A Knife

Eric Clapton

Super Groups Live #SG 37:

ABC Rock Radio Networks Records

Recorded Live at The Baltimore Civic Center
Baltimore, Maryland:
23 April 1985

Original Broadcast –
Week of 24 May 1985

pre-FM Triple Vinyl LP

U.S. radio transcription discs containing portions of a live concert from Eric Clapton promoting his latest release (at the time) BEHIND THE SUN. Contains original commercial blocks for Mountain Dew and DJ introductions by Charlie Kendall. Although this is a triple vinyl set, Side F is blank.

Complete track listing can be found here:

Super Groups Clapton #SG 37 on Discogs

Glenn Frey

Off The Record Specials With Mary Turner #85-33:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 12 August 1985

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Glenn Frey alone, and the discussion centers on all things Eagles and Frey’s solo career. Commercial blocks and studio tracks are mixed with conversations between Frey and Turner, mixed to sound as if they appear in the studio together. The show also features a portion of Linda Ronstadt’s version of Desperado. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #85-33 on Discogs

Dire Straits

Off The Record Specials With Mary Turner #85-42:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 14 October 1985

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Dire Straits front man / guitarist Mark Knopfler and bassist John Illsley, and discusses the success of the band, touring the world and their latest album (at the time) BROTHERS IN ARMS. Despite this fact, the title track from the album is not featured here.

Includes original commercial blocks and DJ intros by Westwood One regular contributor Phil Hendrie. Released on translucent vinyl. This exact show was later released in February of 1986 , and is listed below.

Complete track listing can be found here:

OTRSP #85-42 on Discogs

Dire Straits

King Biscuit Flower Hour Two Part Special
#KB 601 / 602:

D.I.R. Broadcasting Records

Live at The Majestic Theatre,
San Antonio, Texas:

16 August 1985

Original Broadcast –
Part I – 10 November 1985
Part II – 17 November 1985

pre-FM Quadruple Vinyl LP

Another King Biscuit concert special spread out over two consecutive weekends in late November 1985. Recorded during their hugely successful Brothers In Arms tour, this show from Texas features all the hits. Bill Minkin again hosts the show, and original commercial blocks are included.

Complete track listings can be found here:

KBFH #KB 601 Part I on Discogs

KBFH #KB 602 Part II on Discogs

Dire Straits, Heart, Eric Clapton, Robert Plant, Tears For Fears, The Firm

Best Of Super Groups Live #BSG 38:

ABC Rock Radio Network Records

Live Various Locations, Dates

Original Broadcast –
21 – 25 November 1985

pre-FM Quadruple Vinyl LP

Meg Griffin hosts a weekend concert special bringing together several performance from the past year (1985). Artists include Dire Straits (recorded in Houston, Texas on their Brothers In Arms world tour) Heart (recorded in Raleigh, North Carolina), Robert Plant (also recorded in Houston, Texas), Tears For Fears (from Toronto, Canada), Eric Clapton (recorded in Baltimore, Maryland) and a special performance by The Firm (recorded in London, UK). Includes original commercial blocks and DJ intros by Griffin. Like many other D.I.R. Broadcasting vinyl shows, the last side of the discs (in this case, Side F) is blank.

Dire Straits were recorded at The Summit in Houston, Texas on 17 August 1985
Heart were recorded at Dorton Arena in Raleigh, North Carolina on 31 August 1985
Robert Plant was recorded at The Summit in Houston, Texas on 22 June 1985
Tears For Fears were recorded at Massey Hall in Toronto, Canada on 30 May 1985
Eric Clapton was recorded at The Civic Center in Baltimore, Maryland on 23 April 1985
The Firm were recorded at Wembley Arena in London, England on 22 May 1985

Complete track listing can be found here:

Best Of Super Groups Live on Discogs

Roger Daltrey

Off The Record Specials With Mary Turner #85-48:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 25 November 1985

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with The Who’s front man Roger Daltrey, who discusses his love for the band, touring and his latest solo album (at the time) UNDER A RAGING MOON. Includes original commercial blocks and DJ intros by Westwood One regular contributor Phil Hendrie. Released on translucent vinyl. 

This item is not currently listed on Discogs.

Bruce Springsteen

Born In The U.S.A. Special:

Westwood One Radio Networks Records

Recorded in Hartford, Connecticut: XX-XX-1985

Original Broadcast –
Week of 29 November 1985

pre-FM Triple Vinyl LP

Westwood One London Correspondent Roger Scott interviews The Boss in person during his 1985 Born In The U.S.A. tour for this radio broadcast special. A good portion of the interview segments can also be found on A CONVERSATION WITH BRUCE SPRINGSTEEN (which is listed above) as they were recorded for that special as well. The show encompasses Springsteen’s entire career up to his latest release (at the time) BORN IN THE U.S.A., and also features interview segments with Roger Daltrey and Pete Townshend of The Who, along with Huey Lewis, Max Weinberg, Little Steven and Nils Lofgren. Original commercial blocks are mixed with tracks by Springsteen and The E Street Band, along with the interview segments. Westwood One regular contributor Phil Hendrie handles the hosting duties, and as such, sets up the intros and segment breaks.

Complete track listing can be found here:

Born In The U.S.A. Special on Discogs

Billy Crystal’s Countdown To Christmas:

NBC Radio Entertainment Records

Unknown recording date

Original Broadcast -Weeks of 12-24 December 1985

pre-FM Sedecim Vinyl LP

This set is a huge 16 LP music and interview radio show featuring host Billy Crystal, set for broadcast in late December of 1985. Each LP features Crystal presenting one side of a classic rock album plus a “Fantasy Side 2” of selected songs by the featured artist, interspersed with Billy Crystal’s comedy bits, interview segments with the artists, and commercials from Old Spice, AT&T, U.S. Army, etc. Each LP also features Westwood One regular contributor Charlie Kendall providing the intros and comments as well.

The artists presented on this set are Phil Collins & Genesis, Bruce Springsteen, The Who, The Police, The Cars, The Rolling Stones, The Beatles, Hall & Oates, ZZ Top, Fleetwood Mac, Elton John, David Bowie, Led Zeppelin, Tom Petty and Crosby, Stills & Nash.

As the Genesis band members Phil Collins and Mike Rutherford are featured on the Phil Collins & Genesis entry in this series, I have also listed that LP from this exact set on the page titled GENESIS RADIO INTERVIEW SPECIALS – Various Dates.

This set was sent to radio stations in one large mailer box, which contained the fifteen individual artist’s LPs, plus a 16th LP of just promo spots. (In fact, I purchased my copy in an original sealed mailer box from Janice Somach, the wife of show producer Denny Somach. She frequently sells her husband’s shows on eBay and Discogs.)

While there is no listing for the entire 16 LP set on Discogs, there are separate listings for most of the individual LPs available there. It would take up too much space here to list each link, so just go to Discogs and search “Countdown To Christmas” for a complete listing of each LP.

Roger Daltrey

King Biscuit Flower Hour East Coast Tour ’85 Two Part Special #KB 609 / 610:

D.I.R. Broadcasting Records

Recorded Live at D.A.R. Constitution Hall, Washington, D.C.:
4 December 1985
&
The Tower Theatre, Philadelphia, Pennsylvania:
5 December 1985
&
The Orpheum Theatre, Boston, Massachusetts:
8 December 1985

Original Broadcast – Part I –
Week of 5 January 1986
Part II – 12 January 1986

pre-FM Quadruple Vinyl LP

The Biscuit recorded Daltrey in concert during his 1985 East Coast tour of the U.S. in support of his solo effort UNDER A RAGING MOON. Host Bill Minkin notes that this radio special presents Daltrey “for the first time ever as a solo artist.” Recorded in Washington, D.C., Philadelphia, Pennsylvania and Boston, Massachusetts, although there are only two venues that are mentioned by Minkin during the broadcast. (The locations and dates are derived from the Wolfgang’s Vault website, and you can see the list of these Daltrey shows HERE.)

In addition to the stellar live tracks, the show features some backstage interview segments with Daltrey, and two performances from Daltrey’s guitarist Russ Ballard. Ballard performs YOUR TIME IS GONNA COME and VOICES, my all time favorite Ballard song.  A really great show from the Biscuit with Daltrey and his band in top form.

Complete track listings can be found here:

KBFH Daltrey Part I on Discogs

KBFH Daltrey Part II on Discogs

Dire Straits

Off The Record Specials With Mary Turner #86-08:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
24 February 1986

pre-FM Double Vinyl LP

Repackaged broadcast of the exact same OTRSP #85-42 from October 1985, which is listed above. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #86-08 on Discogs

Roger Daltrey

Off The Record Specials With Mary Turner #86-12:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
17 March 1986

pre-FM Double Vinyl LP

Repackaged broadcast of the exact same OTRSP #85-48 from November 1985, which is listed above. There is one slight difference (aside from the commercials). The start of Side C has some different dialogue from the show released in ’85. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #86-12 on Discogs

Jackson Browne

Off The Record Specials With Mary Turner #86-15:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
7 April 1986

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Jackson Browne about his latest album (at that time) LIVES IN THE BALANCE. Includes studio tracks from several other albums and original commercial blocks, which are mixed with conversations between Browne and Turner, designed to sound as if they appear in the studio together. Released on translucent vinyl.

A track listing that leaves much to be desired can be found here:

OTRSP #86-15 on Discogs

The Hooters / Tears For Fears

Superstar Concert Series #SS 86-B:

Westwood One Radio Networks Records

Recorded Live at The Tower Theater, Philadelphia, Pennsylvania: 31 October 1985

& An Unknown Venue:
XX-XX-XXXX
(Possibly The Convention Center, Dallas, Texas:
14 September 1985)

Original Broadcast –
Week of 12 April 1986

pre-FM Triple Vinyl LP

U.S. radio transcription discs containing a double bill live concert performance by The Hooters and Tears For Fears. The Hooters performance was recorded “in front of a hometown crowd” at The Tower Theater in Philadelphia, PA. The venue and recording date for the Tears For Fears segments are not provided during the broadcast. Contains original commercial blocks and DJ introductions by Charlie Kendall. Released on translucent vinyl.

The basis for the suspected venue and date for the Tears For Fears performance is based on a comment on Discogs.

Complete track listing can be found here:

SCS #SS 86-B on Discogs

Don Henley

Superstar Concert Series #SS 86-14:

Westwood One Radio Networks Records

Recorded Live at The Universal Amphitheatre, Universal City, Los Angeles, California:
3 September 1985

Original Broadcast –
Week of 12 July 1986

pre-FM Triple Vinyl LP

Westwood One captured Henley on his Building The Perfect Beast tour live at The Universal Amphitheatre in Universal City, Los Angeles, California on 3 September 1985 for this radio broadcast. Contains original commercial blocks and intros by Westwood One regular contributor Charlie Kendall. This is one of at least two known versions of this show.

Complete track listing can be found here:

SCS #SS 86-14 on Discogs

The Rolling Stones

Made In The Shade #RS Special:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 11 August 1986

pre-FM Quadruple Vinyl LP

U.S. radio transcription discs consisting of a three-hour music and interview special in which Westwood One London correspondent / host Roger Scott provides an extremely detailed history of the band. Contains multiple interview segments with three members of The Stones, their co-workers, writers, managers and friends, along with original commercial blocks and DJ introductions. None of the interviews occur live, they are pre-recorded at earlier times, as was common with these interview specials. Track G2, Everybody Oughta Make A Change, was recorded at The ARMS benefit concert at the Royal Albert Hall on 20 September 1983. This release has no affiliation with The Stones hits album of the same name, other than the band and the title.

Complete track listing can be found here:

Made In The Shade on Discogs

Simple Minds / Tears For Fears

Superstar Concert Series #SS 86-20:

Westwood One Radio Networks Records

Recorded Live at two Unknown Venues:
XX-XX-XXXX

Original Broadcast –
Week of 23 August 1986

pre-FM Triple Vinyl LP

U.S. radio transcription discs containing a double bill live concert performance by Simple Minds and Tears For Fears. The venues and recording dates for these shows are not provided during the recording. Contains original commercial blocks and DJ introductions by Charlie Kendall. Released on translucent vinyl.

Complete track listing can be found here:

SCS #SS 86-20 on Discogs

Don Johnson

Off The Record Specials With Mary Turner
#DJ-OTR / DJ-OTR2:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 25 August 1986

pre-FM Triple Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Don Johnson (of MIAMI VICE fame) for this radio special. The discussion centers on Johnson’s first solo effort, HEARTBEAT, as well as his work on the hit television show that made him famous. Recorded at the height of Johnson’s career, this set is a rare insight into an actor trying desperately to become a rock star.

Commercial blocks and studio tracks are mixed with conversations between Turner and Johnson, designed to sound as if they appear in the studio together.

In addition to the usual double vinyl set, this release contains a third LP entitled DON JOHNSON OFF THE RECORD FEATURES, which contains a track-by-track exploration of the HEARTBEAT album. The FEATURES LP does have some repeat bits from the first OTR set, but it is a more in depth discussion of each song on the album, and contains full versions of each song.

Complete track listing can be found here:

Don Johnson OTR on Discogs

Dire Straits

King Biscuit Flower Hour: Dire Straits – A Retrospective #KB 643:

D.I.R. Broadcasting Records

Recorded Live at Hammersmith Odeon, London, England:
22 – 23 July 1983
&
The Summit, Houston, Texas: 17 August 1985

Original Broadcast –
Week of 31 August 1986

pre-FM Double Vinyl LP

King Biscuit presents a collection of live tracks from two different Dire Straits performances. Some tracks were recorded during the 1983 Prince’s Trust Concert, and  are also available on King Biscuit Flower Hour: The Prince’s Trust Fund Rock Gala (#KB 502) and a Best Of The Biscuit show (#BOB 548), both of which are listed above. The remaining tracks were recorded at The Summit in Houston, Texas on 17 August 1985. That Texas show is also available on a King Biscuit Flower Hour show listed above. Once again, Bill Minkin handles hosting duties, and original commercial blocks are present.

Complete track listing can be found here:

KBFH #KB 643 on Discogs

Bruce Hornsby And The Range / Red Rider

Westwood One In Concert #IC 86-21:

Westwood One Radio Networks Records

Recorded Live at The Boathouse, Norfolk, Virginia:
23 August 1986
&
The Trocadero, Philadelphia, Pennsylvania:
11 September 1986

Original Broadcast –
Week of 20 October 1986

pre-FM Double Vinyl LP

Steve Downes hosts a double bill concert special featuring Bruce Hornsby and The Range, captured during their first solo tour, and Red Rider. Original commercial blocks are included.

Complete track listing can be found here:

In Concert Bruce Hornsby & Red Rider on Discogs

U2

King Biscuit Flower Hour: Best Of The Biscuit #BOB 652:

D.I.R. Broadcasting Records

Recorded Live at The Orpheum Theatre, Boston, Massachusetts:
6 May 1983

Original Broadcast –
Week of 2 November 1986

pre-FM Double Vinyl LP

This is the second Best Of The Biscuit show featuring U2’s performance from the Orpheum Theatre in 1983. The first aired in June of 1984, while the broadcast date for the original show was 29 May 1983. This “Best Of” show contains 12 of the 15 songs captured that night, with the band in top form on their WAR Tour.

It is very rare to find King Biscuit shows featuring U2, and when I found this on eBay, I snatched it up immediately. My copy did not come with a Cue Sheet.

Once again, Bill Minkin handles hosting duties, and original commercial blocks are present.

Complete track listing can be found here:

KBFH #BOB 652 on Discogs

Genesis

Westwood One In Concert #IC 86-23:

Westwood One Radio Networks Records

Recorded Live at The Empire Pool, Wembley, UK:
15 April 1975

&

The Nassau Coliseum
Long Island, New York:
29 November 1981

Original Broadcast –
Week of 17 November 1986

pre-FM Double Vinyl LP

One of the most bootlegged radio broadcasts in Genesis’ history was recorded at the Empire Pool, Wembley. Genesis played two nights at Wembley in April of 1975, and the BBC were contracted to record both nights. Some sources quote the recording date as 14th, but comparison with an audience tape from 15th shows the recording is from the second night. This is Westwood One’s initial version of this concert, the first of many, and the first of four such copies that I own. All three versions are identical, with the exception of the commercials.

Sent out on a two LP set, the first part is forty-five minutes of Wembley 1975, the second part contains tracks from The Nassau Coliseum in Long Island, New York from 29 November 1981, except No Reply At All and maybe Misunderstanding which were most likely recorded the previous night at The Savoy Theatre on 28 November 1981.

Complete track listing can be found here:

In Concert Genesis #IC 86-23 on Discogs

The Police

Then And Now #POLICE ’86:

D.I.R. Broadcasting Records

Unknown recording date

Original Broadcast –
Week of 27 November 1986

pre-FM Triple Vinyl LP

A 90 minute radio special released to coincide with the band’s latest (at that time) Greatest Hits album EVERY BREATH YOU TAKE (THE SINGLES). An unidentified host plays pre-recorded interview clips with all three band members, along with studio tracks and unreleased live material spanning the band’s entire career. Original commercials for Budweiser are included. Super-rare set.

Complete track listing can be found here:

The Police Then And Now on Discogs

Peter Gabriel

Profile ’86 #NBC 86-18:

NBC Radio Entertainment Records

Unknown recording date

Original Broadcast –
Week of 27 November 1986

pre-FM Double Vinyl LP

Host Dan Neer profiles Peter Gabriel through pre-recorded interview clips and studio tracks. Gabriel discusses leaving Genesis behind to start a solo career, touring, playing with artists such as Phil Collins (who provides an interview segment), Kate Bush, Youssou N’Dour and Stewart Copeland, joining Amnesty International and his latest album (at that time) SO. Contains original commercial blocks. Released on translucent vinyl.

Complete track listing can be found here:

Peter Gabriel Profile ’86 on Discogs

Genesis

King Biscuit Flower Hour The Genesis Event Four Part Special #KB 656 / 657 / 658 / 659

D.I.R. Broadcasting Records

Recorded Live at The Forum, Los Angeles, California:
14 – 15 October 1986

Original Broadcast –
Part I: 30 November 1986
Part II: 7 December 1986
Part III: 14 December 1986
Part IV: 21 December 1986

pre-FM Octuple Vinyl LP

The Genesis Event was a massive, marathon four-part show broadcast over four consecutive weeks compiled by King Biscuit to showcase their new recording of the band on the Invisible Touch Tour. As with all King Biscuit LP sets, each of the four shows was distributed on two LPs one of which is one-sided, making 8 LPs (12 sides) in total.

Part I contains various live Genesis songs which over the years have accumulated in the King Biscuit archives, recorded at The Spectrum in Philadelphia, Wembley Arena, The Rainbow Theatre and The Nassau Coliseum, along with interview clips from the band members. There are also a few of the new 1986 songs from the L.A. Forum. Part II concentrates on the various Genesis solo projects but with a couple more tracks from L.A. Forum 1986 show. Parts III and IV are dedicated entirely to the L.A. Forum 1986 recording, and were reproduced in June of 1987 as a two-part Best Of The Biscuit (listed below). 

Features original commercial blocks and DJ introductions by King Biscuit regular contributor Bill Minkin. Details about the tracks and recording venues can be found on the Discogs entries; links below. This is a fantastic set to own, one that is very hard to find, and took me years to complete.

I’ve also included several scans from the  INVISIBLE TOUCH era, some related to The Event, others not so much. But I’ve added them because all of them are pretty cool and they’re all in my personal collection.

Complete track listings can be found here:

KBFH The Genesis Event Part I on Discogs

KBFH The Genesis Event Part II on Discogs

KBFH The Genesis Event Part III on Discogs

KBFH The Genesis Event Part IV on Discogs

Van Halen

Superstar Concert Series #SS 86-26:

Westwood One Radio Networks Records

Recorded Live at The New Haven Veterans Memorial Coliseum, New Haven, CT:
27 August 1986

Original Broadcast –
13 December 1986

pre-FM Triple Vinyl LP

Recorded during their 5150 tour, this was Van Halen’s first tour with lead singer Sammy Hagar. This exact show was repackaged and released to radio stations again in October 1987, and was the source for countless bootlegs. This concert also features the audio from the later released official video entitled LIVE WITHOUT A NET.

This is a very hard to find set, and has increased in value since the death of EVH. I paid $10 for this on eBay, after a seller made a mistake and canceled my order.

Complete track listing can be found here:

SCS #SS 86-26 on Discogs

Journey

Superstar Concert Series #SS 86-G:

Westwood One Radio Networks Records

Recorded Live at The Spectrum, Philadelphia, Pennsylvania:
15 October 1986

Original Broadcast –
20 December 1986

pre-FM Triple Vinyl LP

Recorded during their Raised On Radio tour, this was Journey’s last tour with lead singer Steve Perry. This exact show was repackaged and released to radio stations again in November 1987. Note that the labels on this release indicate show #SS 85-G, while the Cue Sheet indicates show #SS 86-G. These are scans of the actual labels on the LPs, they simply have a misprint. The correct show number is #SS 86-G.

Ironically, this show was recorded on the exact same night as the infamous L.A. Forum show on the Genesis Invisible Touch tour, just on the other side of the country, and it aired the same weekend as Part IV of The Genesis Event was broadcast on radio stations across the U.S..

Complete track listing can be found here:

SCS #SS 86-G on Discogs

The Hooters, Roger Daltrey, Heart, The Fabulous Thunderbirds, Mike & The Mechanics, Eddie Money, Mr. Mister, Genesis & Pete Townshend

The King Biscuit Flower Hour 1986
Year End Special
#KB-660:

D.I.R Broadcasting Records

Recorded Live at The Various Locations / Dates

Original Broadcast –
28 December 1986

pre-FM Double Vinyl LP

King Biscuit “best of” radio show featuring multiple artists captured live in concert during 1986. Features original commercial blocks and DJ introductions by King Biscuit regular contributor Bill Minkin.

Of note about this particular special is the fact that there are four complete sides of material present, rather than the typical three sides. Side D of almost all other King Biscuit shows is usually blank, but on this one the entire side features Van Halen frontman David Lee Roth and his 1986 bandmates Billy Sheehan, Steve Vai and Gregg Bissonette in a series of seven segments intended to be utilized as a New Year’s Eve special program. Notes abut this “special” program can be seen in the provided scans.

KBFH #KB 660 on Discogs

Peter Gabriel

Off The Record Specials With Mary Turner #86-43:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Unknown Month / Day 1986

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Peter Gabriel. The discussion centers on his history with and success of the band Genesis, his solo career, and his latest release (at that time) SO.

Commercial blocks and studio tracks are mixed with conversations between Gabriel and Turner, mixed to sound as if they appear in the studio together. Released on translucent vinyl.

Note: This exact same show, albeit with different commercial blocks, was originally released in August of 1986 under show #86-32, and then was repackaged for airplay at least one other time in August of 1988. Neither of those versions are currently listed on Discogs. Given that this show is numbered #86-43, it was definitely released after August of that year.

Complete track listing can be found here:

OTRSP #86-43 on Discogs

Steve Winwood

Superstar Concert Series #87-01:

Westwood One Radio Networks Records

Recorded Live at The Blossom Music Center, Cuyahoga Falls, Ohio:
17 September 1986

Original Broadcast –
Weekend of 17 January 1987

pre-FM Triple Vinyl LP

This is another in the Superstar Concert Series of shows which called into question the actual recording date of the concert, this time featuring Steve Winwood. Winwood and his band appeared at The Blossom Music Center in Cuyahoga Falls (just outside Cleveland) for a show who’s actual recording date has been incorrectly identified as 18 January 1987. That is most likely due to the fact that this show, which was the original broadcast version of the concert by Westwood One, aired on that exact weekend of 17 January 1987.  There was a later, identical broadcast in November of 1987, under show #87-E, which was (for a time) considered to be the original broadcast version. I previously owned a copy of that version (which you can see listed on Discogs  HERE and which includes the incorrect recording date). The actual recording date of the concert was 17 September 1986.

This show, like show #87-E, features host Steve Downes, along with original commercial blocks, and was released on translucent vinyl. For clarification, I have included scans of both show #87-01 and #87-E on this site, however, I no longer own a copy of show #87-E.

This item is not currently listed on Discogs, however, show #87-E is listed there, and the link is featured above.

Eric Clapton

King Biscuit Flower Hour #KB 670:

D.I.R. Broadcasting Records

Recorded Live at The Richmond Coliseum
Richmond, Virginia:
22 April 1985

Original Broadcast –
8 March 1987

pre-FM Double Vinyl LP

Recorded live during Clapton’s tour in support of his 1985 release BEHIND THE SUN, this performance contains a portion of the much bootlegged show at the Richmond Coliseum. Contains original commercial blocks and introductions by King Biscuit regular contributor Bill Minkin.

Complete track listing can be found here:

KBFH #KB 670 on Discogs

David Gilmour, Pete Townshend, Chrissie Hynde & Friends

King Biscuit Flower Hour #KB 673:

D.I.R. Broadcasting Records

Recorded Live at The Royal Albert Hall, London, England:
9 February 1986

Original Broadcast –
29 March 1987

pre-FM Double Vinyl LP

This show is very similar to the King Biscuit show entitled ALONE AT LAST which featured Phil Collins, Gilmour and Hynde performing solo from their respective bands. That show aired in December of ’87, and was sent to radio stations on compact disc instead of vinyl. The Gilmour and Hynde tracks on that show were derived from performances captured for this show. (More about that show can be found HERE.)

This show contains performances from a special one-off benefit concert known as the Colombian Volcano Disaster Appeal Concert. In November of 1985, the Nevada del Ruiz volcano caused an immense natural disaster in Colombia, when it melted glaciers and caused catastrophic flooding that resulted in the deaths of over 25,000 people. Native Colombian musician, Chucho Merchan, with the help of Who guitarist, Pete Townshend, began organizing a charity event to raise funds for the surviving victims and to raise awareness of their plight. Gilmour, Townshend, Hynde, Annie Lennox and Mike Oldfield all appeared at the show. Contains original commercial blocks and introductions by King Biscuit regular contributor Bill Minkin.

Complete track listing can be found here:

KBFH #KB 673 on Discogs

Eddie Money

King Biscuit Flower Hour: The Best Of Eddie Money #KB 674:

D.I.R. Broadcasting Records

Recorded Live at The Wiltern Theatre, Los Angeles, California:
18 October 1986

Original Broadcast –
5 April 1987

pre-FM Double Vinyl LP

Recorded live during Money’s tour in support of his 1986 release CAN’T HOLD BACK. A high energy show with great versions of many of his hits. The show would later emerge as a promotional-only live album serviced to radio stations. The show also features guest guitarist, Steve Farris, from Mr. Mister. Contains original commercial blocks and introductions by King Biscuit regular contributor Bill Minkin.

Complete track listing can be found here:

KBFH #KB 674 on Discogs

Genesis

Westwood One In Concert #IC 87-09:

Westwood One Radio Networks Records

Recorded Live at The Empire Pool, Wembley, England:
15 April 1975

&

The Nassau Coliseum
Long Island, New York:
29 November 1981

Original Broadcast –
Week of 11 May 1987

pre-FM Double Vinyl LP

This is the second version of this exact show that I own. Identical to #IC 86-26 (listed above), #IC 88-25 and #IC 90-03 (both listed below). This show and #IC 90-03 are also the only versions on vinyl which are not listed on Dave Dunnington’s website.

One unique note about this set: The Cue Sheet indicates that the show number is #87-09, referring to the fact that this would be Westwood One’s ninth show of 1987, however, the original airdate (as indicated by the Cue Sheet as well) states 11 May 1986. I have never seen a Westwood One Cue Sheet (or any pre-FM radio show Cue Sheet) which had a show number that did not correspond with the year of airing. This means that either the show number is incorrect and should have read #86-09, or the airdate is incorrect and should have read 11 May 1987. There is no definitive way to know for sure, but my guess is that the show number on the Cue Sheet is the one that is misprinted, especially given that the Matrix / Runouts indicate that the show number is #87-09.

Also, there are several songs on the Cue Sheet which are misidentified. For starters (and these two are small ones) Back In New York City is misidentified as “Back In New York” and The Carpet Crawlers is misidentified as “Carpet Crawl” on the Cue Sheet. The other song errors are more severe. Hairless Heart is misidentified as “The Chamber Of 32 Doors”, The Waiting Room is misidentified as “Evil Jam”, and the last song from the Wembley show, misidentified as “The Lamb Lies Down On Broadway” is actually a medley featuring Silent Sorrow In Empty Boats / The Colony Of Slippermen (Arrival) / Ravine / The Light Dies Down On Broadway / Riding The Scree.

Complete track listing can be found here:

In Concert Genesis #87-09 on Discogs

Genesis

King Biscuit Flower Hour Best Of The Biscuit -Genesis Two Part Special #BOB 683 / 684:

D.I.R. Broadcasting Records

Recorded Live at The Forum, Los Angeles, California:
14 – 15 October 1986

Original Broadcast –
Part I: 7 June 1987
Part II: 14 June 1987

pre-FM Quadruple Vinyl LP

So here it is… one of the best Genesis radio programs ever broadcast! Back in June of 1987, the King Biscuit Flower Hour ran a two part “Best Of” special over the course of two consecutive Sunday evenings containing portions of the now infamous L.A. Forum show from October 1986. I captured those shows onto cassette tapes, but I lost them some years later during a move. I cannot begin to describe the excitement I felt at the time, having never seen Genesis live in concert, when Bill Minkin announced that we would “go right to the stage at the Forum in Los Angeles” for Genesis! I had no idea the show was coming on, and when it started, I barely had time to grab a cassette tape and throw it into my stereo tape deck. And my excitement only grew when, years later, I finally obtained these vinyl discs for my private collection.

This performance comes from the sold out Invisible Touch tour. Genesis played five nights from 13 October to 17 October 1986 at The Los Angeles Forum and from comparison with audience tapes we know that Phil’s dialog is all from the shows recorded on the 14th and 15th. Presumably the songs are also from these two dates. The set features the smoldering closing sections of Supper’s Ready at the end of the In The Cage Medley, with Phil’s voice in screaming top form. This section was subsequently dropped when Genesis reverted to their standard ending of Afterglow. In Too Deep and Follow You Follow Me, also dropped early in the tour, are present. But it is, and always will be, the version of Mama that steals the show for me. This is, hands down, my most prized possession in my entire vinyl collection. (I actually have two copies of this show on vinyl, because there was a deep skip during That’s All on my original copy.)

This show was originally broadcast in December of 1986 by King Biscuit as part of a huge, four weekend special entitled The Genesis Event, which is listed above. The tracks on this two-part set were originally broadcast on Parts III and IV of that show.

So why is this show more favorable to me than the four part Event? The answer is simple: I heard this one first and in real time on my radio as a kid. I will never forget hearing it live, even though I now have both shows in my collection.

Complete track listing can be found here:

KBFH #BOB 683 / 684 on Discogs

Eric Clapton

Up Close:

MCA Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 10 June 1987

pre-FM Double Vinyl LP

MCA Radio Network interview and music special released for June 1987 broadcast. Hosted by Dan Neer. Contains original commercial blocks and interview segment in which Clapton discusses his life and musical career from its inception to his latest release (at the time) AUGUST.

Complete track listing can be found here:

Eric Clapton Up Close on Discogs

Bruce Springsteen & Various Artists

King Biscuit Flower Hour July 4th Special – A Springsteen Tribute
#KB 687:

D.I.R. Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 5 July 1987

pre-FM Double Vinyl LP

King Biscuit Flower Hour presents a one-off July 4th special celebrating the music of Bruce Springsteen. Various cover versions of Springsteen tracks are included by multiple artists, all recorded live in concert. The show is hosted by series regular Bill Minkin. The artists included are Dave Edmunds, Patti Smith,  Warren Zevon, Southside Johnny, Gary U.S. Bonds, Robert Gordon, Greg Kihn band, Manfred Mann and The Boss himself. The show also contains original commercial blocks. Brief interview segments with Southside Johnny and Greg Kihn are also included, during which the two artists discuss Springsteen’s influence on their careers. Not all concert performance venues or dates are provided by Minkin during the show, but the ones that he does mention are as follows:

Dave Edmunds: Capitol Theatre, Passaic , New Jersey – 1982
Patti Smith: Unknown Venue, Paris, France – 1978
Warren Zevon: Unknown Venue, Asbury Park, New Jersey – 1982
Southside Johnny: The Bottom Line, New York – 1976
Gary U.S. Bonds: Capitol Theatre, Passaic , New Jersey – No Date Provided
Robert Gordon: The Tower Theatre, Philadelphia, Pennsylvania – 1979
Greg Kihn: The Savoy, New York – 1981
Manfred Mann: Unknown Venue, Budapest, Hungary – No Date Provided
Manfred Mann: No Venue / Date Information Provided
Southside Johnny: No Venue / Date Information Provided
Springsteen: Unknown Venue, New Jersey – July, 1981

Complete track listing can be found here:

KBFH July 4th Special on Discogs

Dire Straits

Superstar Concert Series #SS 87-15:

Westwood One Radio Networks Records

Recorded Live at Wembley Arena, London, England:
10 July 1985

Original Broadcast –
Week of 17 – 19 July 1987

pre-FM Triple Vinyl LP

Another show recorded live during the BROTHERS IN ARMS Tour and sent to radio stations in the U.S. for broadcast, this was one of the most popular Straits Westwood One shows. As such, this concert was reproduced many times following this on LP and compact disc. This set features host Charlie Kendall and commercial blocks from Coke, Coke Classic and Sprite. Solid Rock, Expresso Love and Romeo And Juliet were not captured at Wembley Arena in ’85, but were taken directly from the official release ALCHEMY – DIRE STRAITS LIVE (which was recorded at The Hammersmith Odeon in London on 22–23 July 1983 and released on 16 March 1984) and edited into the show by Westwood One.

Complete track listing can be found here:

SCS #SS 87-15 on Discogs

Bruce Hornsby And The Range

King Biscuit Flower Hour #KB 693:

D.I.R. Broadcasting Records

Recorded Live at The Ritz, New York City, New York:
2 February 1987

Original Broadcast –
Week of 16 August 1987

pre-FM Double Vinyl LP

Bruce Hornsby And The Range were deep into their first tour in support of their debut album, THE WAY IT IS, when King Biscuit captured their performance at the intimate Ritz club in New York City. The show features the original Range line-up, including George Marinelli (later to become the lead guitarist for Bonnie Raitt). The opening track, Jacob’s Ladder, was originally written for Huey Lewis & The News. These LPs were later sourced for the promo LP LIVE – THE WAY IT IS TOUR 1986-87 (which I own a copy of and can be viewed HERE) and several subsequent compact disc releases of the same show. Includes original commercial blocks and intros by King Biscuit regular contributor Bill Minkin.

Complete track listing can be found here:

KBFH #KB 693 on Discogs

Roger Daltrey

Off The Record Specials With Mary Turner #87-35:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 24 August 1987

pre-FM Double Vinyl

Another in the Off The Record Specials series, and another Mary Turner interview with Roger Daltrey. This time the pair discus his latest solo album (at the time) CAN’T WAIT TO SEE THE MOVIE. And again the show is designed to sound as if the two appear in the studio together. Includes original commercial blocks and DJ intros by Westwood One regular contributor Phil Hendrie. Released on translucent vinyl. 

This item is not currently listed on Discogs.

Eric Clapton

King Biscuit Flower Hour #KB 696:

D.I.R. Broadcasting Records

Recorded Live at Live at The Richmond Coliseum
Richmond, Virginia:
22 April 1985

Original Broadcast –
Week of 6 September 1987

pre-FM Single Compact Disc

This is the very first King Biscuit show to ever be produced on compact disc, as mentioned multiple times during the show. Recorded live during Clapton’s tour in support of his 1985 release BEHIND THE SUN, this performance contains a portion of the much bootlegged show at the Richmond Coliseum. Contains original commercial blocks and introductions by King Biscuit regular contributor Bill Minkin.

Complete track listing can be found here:

KBFH #KB 693 on Discogs

Dire Straits

King Biscuit Flower Hour #KB 87-XX:

D.I.R. Broadcasting Records

Recorded Live at The Summit, Houston, Texas:
17 August 1985

Original Broadcast –
Week of 20 September 1987

pre-FM Single Compact Disc

One of the earliest King Biscuit radio shows available on compact disc, (but not the first to be broadcast from that source) this show captured Dire Straits at their show in Houston, Texas on their world tour in support of their 1985 album BROTHERS IN ARMS. Contains original commercial blocks and introductions by King Biscuit regular contributor Bill Minkin. Tracks 1 – 4 are the actual radio show while Tracks 5 and 6 are promo spots.

Complete track listing can be found here:

KBFH Dire Straits CD on Discogs

Genesis, Eddie Money, The Kinks, Bruce Hornsby & The Range, Cutting Crew, Crowded House

The King Biscuit Flower Hour 1987 Year End Special #KB 87-XX:

D.I.R. Broadcasting Records

Recorded Live at Various Locations / Dates

Original Broadcast –
Week of 27 December 1987

pre-FM Single Compact Disc

Another early King Biscuit radio show pressed on compact disc, this show presents several musical acts (all of whom were on tour in 1987) in a Year End Special. The Biscuit would broadcast year end “wrap-up” shows every year, gathering performances from artists whose shows had been captured by D.I.R.

Of note about this show, particularly for Genesis fans, is the fact that not all tracks were recorded in 1987.  The opening song, Illegal Alien, was recorded by the Biscuit, but not on the 1986/’87 Invisible Touch Tour. It was actually recorded in 1984 on the Mama Tour.

Contains original commercial blocks and introductions by King Biscuit regular contributor Bill Minkin. Tracks 2 – 4 are the actual radio show while Tracks 5 through 16 are promo spots.

Complete track listing can be found here:

KBFH 1987 Year End Special CD on Discogs

Steve Winwood

Off The Record Specials With Mary Turner #87-39:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Unknown Month / Day 1987

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Steve Winwood, and discusses his history with Traffic, the Spencer Davis Group, his solo career and his latest release (at that time) BACK IN THE HIGH LIFE. Commercial blocks and studio tracks are mixed with conversations between Winwood and Turner, designed to sound as if they appear in the studio together. My copy did not come with a Cue Sheet, so the exact broadcast window is unknown. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #87-39 on Discogs

Eric Clapton

Behind The Mask: The Eric Clapton Special #ECS 321:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 21 March 1988

pre-FM Quadruple Vinyl LP

An in in depth look at the career of Eric Clapton featuring over 35 songs highlighting his career from his earliest days on the British blues band circuit, his time with The Yardbirds, Derek And The Dominos and Cream, up until his most current (at that time) CROSSROADS. Also features interviews with Eric’s grandmother and mother,  as well as fellow performers and band mates including Pete Townshend, John Mayall, Phil Collins, Mark Knopfler, Elton John and George Harrison among others. Original commercial blocks also included. Released on translucent vinyl.

Complete track listing can be found here:

Clapton Behind The Mask on Discogs

Robert Plant

Off The Record Specials With Mary Turner Part I #88-15:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 4 April 1988

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Plant for Part I of this two-part this radio broadcast special. Commercial blocks and studio tracks are mixed with conversations between Plant and Turner, designed to sound as if they appear in the studio together. Released on translucent vinyl to promote Plant’s latest album (at that time) NOW AND ZEN. This exact show was repackaged for broadcast in September of ’88 under show #88-37. I previously had a copy, but I sold it on eBay. I have included scans of that show for comparison.

This item is not currently listed on Discogs.

Robert Plant

Off The Record Specials With Mary Turner Part II #88-16:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 12 April 1988

pre-FM Double Vinyl LP

This is Part II of the above listed two-part radio broadcast special. Commercial blocks and studio tracks are mixed with conversations between Plant and Turner, again designed to sound as if they appear in the studio together. Released on translucent vinyl.  This exact show was repackaged for broadcast in September of ’88 under show #88-38. I previously had a copy, but I sold it on eBay. I have included scans of that show for comparison.

This item is not currently listed on Discogs.

Peter Gabriel

Legends Of Rock
#LG 88-26:

NBC Radio Entertainment Records

Unknown recording date

Original Broadcast –
Week of 20 – 26 June 1988

pre-FM Double Vinyl LP

Host Ray White plays interview clips and music from Gabriel’s career up to his latest release (at that time) PASSION in this radio special. Contains original commercial blocks. As with the other entries in this series, Side D is blank.

Complete track listing can be found here:

Peter Gabriel Legends Of Rock on Discogs

Bruce Hornsby And The Range

Superstar Concert Series #CO 88-20:

Westwood One Radio Networks Records

Recorded Live in Orlando, Florida (Possibly at The Bob Carr Performing Arts Center: 14 July 1988)

Original Broadcast –
Week of 27 August 1988

pre-FM Triple Vinyl LP

This is the very first Westwood One Superstar Concert Series broadcast of this show, and at least one more would follow. Recorded during the band’s Scenes From The Southside ’88-’89 Tour. Includes original commercial blocks and radio intros by Superstar Concert Series regular Steve Downes. Released on translucent vinyl.

Recording Location / Date Note: During the start of Mandolin Rain, Hornsby can be heard discussing the fact that the show is being recorded for Westwood One. A fan can be heard shouting: “Welcome to Orlando!” Hornsby then states: “We picked Orlando because we liked it.” The exact recording date for this concert is not known, however, the false recording date of 27 August 1988 has been linked to this show for many years. In point of fact, I am most likely the source for this incorrect date. That is because I recorded the show off FM radio on 27 August 1988, and at the time, was unaware that these shows had been pre-recorded for broadcast. (I was under the false impression that the show was a live simulcast.)  I therefore dated the cassette tape with the recording date. Years later, I uploaded a torrent of this exact recording to the ZOMB torrent site, and attributed the recording date as the performance date. Apparently, it stuck. Oops… my bad!  Needless to say, I was very excited to finally discover the original vinyls for this show, even though I still have the original cassette tapes of the FM broadcast.

It is known that The Range played a concert at the Bob Carr Performing Arts Center in Orlando on 14 July 1988, and it seems likely that this is the original source of this recording.

Complete track listing can be found here:

SCS #CO 88-20 on Discogs

Sting, Eurythmics, Simple Minds & Peter Gabriel 

Superstar Concert Series – The Nelson Mandela 70th Birthday Tribute Concert  #CO 88-21:

Westwood One Radio Networks Records

Recorded Live at Wembley Stadium, London, England:
11 June 1988

Original Broadcast –
Week of 28 August 1988

pre-FM Triple Vinyl LP

Another Westwood One Superstar Concert Series show, this time featuring several artists, all captured during the day-long Nelson Mandela 70th Birthday Tribute Concert at Wembley Stadium.  Steve Downes hosts a show which occurred on 11 June 1988 at London’s Wembley Stadium. This version of the  show features Sting, Eurythmics, Simple Minds and Peter Gabriel. (Gabriel only performs one song, Biko, at the end of the Simple Minds set.) There is another version of this concert featuring some of the Simple Minds set, along with tracks by Dire Straits and Eric Clapton, which can be found listed below. Original commercial blocks are included. Released on translucent vinyl.

Complete track listing can be found here:

SCS #CO 88-21 on Discogs

John Mellencamp

King Biscuit Flower Hour:
#KB 88-XX

King Biscuit Flower Hour Records

Recorded Live at Pershing Municipal Auditorium, Lincoln, Nebraska:
12 August 1982

Original Broadcast –
Week of 26 October 1988

pre-FM Single Compact Disc

Captured during Mellencamp’s 1982 Tour, this show from Lincoln, Nebraska was originally released on vinyl, and can be found in several bootleg variations as well. This compact disc version contains original commercial blocks and DJ introductions by Ed Sciaky (pronounced Shockey). 

Complete track listing can be found here:

KBFH Mellencamp ’82 on Discogs

Randy Newman & Mark Knopfler

Timothy White’s Rock Stars – A Dixie Super Session #RS 88-1:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 7 November 1988

pre-FM Double Vinyl LP

Host Timothy White presents an in-studio  live session with Randy Newman and Mark Knopfler celebrating Newman’s latest release (at that time) LAND OF DREAMS. Recorded at the Sea-Saint Studios in New Orleans, the two artists perform a few songs live, while White also plays tracks from the album and interviews both men about the recording process. Released on translucent vinyl.

A track listing that leaves much to be desired can be found here:

Timothy White’s Rocks Stars Newman & Knopfler on Discogs

Genesis, Foreigner, Robert Plant & Led Zeppelin

Superstar Concert Series – The Atlantic Records 40th Anniversary Celebration
#CO 88-E:

Westwood One Radio Networks Records

Recorded Live at Madison Square Garden, New York, NY:
14 May 1988

Original Broadcast –
Weekend of 11-13 November 1988

pre-FM Triple Vinyl LP

This addition to the Superstar Concert Series features edited highlights of the Atlantic Records 40th Anniversary Celebration, recorded at Madison Square Garden in New York city in May of ’88. The original concert lasted almost 13 hours, and portions were broadcast live on HBO (Home Box Office), along with an FM stereo simulcast. Only artists who had released material on the Atlantic label in the United States performed, with the artists spanning the 40 years of the company’s existence.

Although Phil Collins performed solo at this show, his performance is not included on this recording. The dreaded Genesis “Medley,” (which included bits from Genesis, PC, Mike and The Mechanics and Tony Banks’ solo work) is the first track on this show.

Some Atlantic signings, who had either officially split up or who had not performed together for a number of years, re-formed especially to perform at the concert. One such band was Led Zeppelin. Robert Plant and his (solo) band performed before the much anticipated Led Zeppelin reunion, but his section is placed after Zeppelin on this set. There had been plans to close the performance with a greatest hits all-star jam, but this idea was shelved and it was decided that Zeppelin would be the final act to perform. Also, during Foreigner’s last song, I Want To Know What Love Is, they were joined on stage by numerous Atlantic artists who were present and performed that evening, including Phil Collins, Roberta Flack, and Crosby, Stills & Nash. These artists sang backing vocals as a choir on the song. Foreigner’s lead singer, Lou Gramm, later said that he had no idea this was going to transpire, but he was delighted that it had.

Contains original commercial blocks and DJ intro by Steve Downes.

Complete track listing can be found here:

SCS # CO 88-E on Discogs

Keith Richards

Off The Record Specials With Mary Turner #88-48:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 21 November 1988

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an  interview with Keith Richards for this radio broadcast special promoting Keith’s first solo record, TALK IS CHEAP.

Commercial blocks and studio tracks are mixed with conversations between Richards and Turner, designed to sound as if they appear in the studio together. Identical to a later broadcast under show #89-15 (listed below), but note that the Cue Sheet for this show lists two additional songs not listed on the later show. Those songs are How I Wish and Oh, Carol which is an early live version performed by The Rolling Stones. As I have both shows in my collection, I can attest that those songs exist on both shows as it was not uncommon for Westwood One to repackage these shows for later airing. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #88-48 on Discogs

Genesis

Westwood One In Concert #IC 88-25:

Westwood One Radio Networks Records

Recorded Live at The Empire Pool, Wembley, England:
15 April 1975

&

The Nassau Coliseum
Long Island, New York:
29 November 1981

Original Broadcast –
Week of 5 December 1988

pre-FM Double Vinyl LP

This is the third version of this exact show that I own. Identical to #IC 86-26 and #IC 87-09, both listed above, and #IC 90-03 listed below. The same Cue Sheet track misidentifications are present here.

Complete track listing can be found here:

In Concert Genesis #IC 88-25 on Discogs

Steve Winwood

Off The Record Specials With Mary Turner #88-51:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 12 December 1988

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Steve Winwood for this radio broadcast special promoting Steve’s 1988 release, ROLL WITH IT. Commercial blocks and studio tracks are mixed with conversations between Winwood and Turner, designed to sound as if they appear in the studio together. Released on translucent vinyl.

This item is not currently listed on Discogs.

Keith Richards

Up Close Part I #88-21:

Media America Radio Records

Unknown recording date

Original Broadcast –Unknown Month / Day 1988

pre-FM Double Compact Disc

Host Dan Neer interviews Keith Richards for this radio broadcast special promoting Keith’s first solo record, TALK IS CHEAP. Commercial blocks and studio tracks are mixed with conversations between Richards and Neer, who do not appear in the studio together. This is Part I of a two-part show, Part II can be viewed directly below.

A track listing that leaves much to be desired can be found here:

Up Close 88-21 on Discogs

Keith Richards

Up Close Part II #88-22:

Media America Radio Records

Unknown recording date

Original Broadcast –Unknown Month / Day 1988

pre-FM Double Compact Disc

This is Part II of the above listed show.

A track listing that leaves much to be desired can be found here:

Up Close 88-22 on Discogs

Huey Lewis And The News

Superstar Concert Series #CO 89-01:

Westwood One Radio Networks Records

Recorded Live at The the Blossom Music Centre,
Cuyahoga Falls, Ohio:
10 August 1988

Original Broadcast –
Week of 21 January 1989
pre-FM Triple Vinyl LP

Westwood One Radio Networks show featuring a live performance from Huey Lewis And The News during their Small World / 10th Anniversary World Tour. Includes original commercial blocks and radio intros by Superstar Concert Series regular Steve Downes. The recording venue is mentioned by Downes during Track A1. Released on translucent vinyl.

Complete track listing can be found here:

SCS #CO 89-01 on Discogs

Elton John

Westwood One In Concert (B.B.C. Classic Concert Show # I 89-07)

Westwood One Radio Networks Records

Recorded Live at The Hammersmith Odeon
London, England:
24 December 1973

Original Broadcast –
20 March 1989

pre-FM Double Vinyl LP

Originally recorded by the B.B.C. in December of 1973 at London’s Hammersmith Odeon, this radio show features Elton John performing some of his best known early hits. Contains original commercial blocks and introductions by Westwood One regular contributor Steve Downes. The members of the band are mentioned by Downes at the very top of the show. 

Complete track listing can be found here:

In Concert #I 89-07 on Discogs

Keith Richards

Off The Record Specials With Mary Turner #89-15:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 3 April 1989

pre-FM Double Vinyl LP

Another in the Off The Record Specials series, and another Mary Turner interview with Keith Richards for this radio broadcast special promoting Keith’s first solo record, TALK IS CHEAP.

Commercial blocks and studio tracks are mixed with conversations between Richards and Turner, designed to sound as if they appear in the studio together. Identical to an earlier broadcast under show #88-48 (listed above). As with that show, note that the Cue Sheet for this show lists two additional songs not listed on the earlier show. Those songs are How I Wish and Oh, Carol which is an early live version performed by The Rolling Stones. As I have both shows in my collection, I can attest that those songs exist on both shows as it was not uncommon for Westwood One to repackage these shows for later airing. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #89-15 on Discogs

John Mellencamp

Superstar Concert Series #CO 89-06:

Westwood One Radio Networks Records

Recorded Live at The Reunion Arena
Dallas, Texas:
4 March 1988

Original Broadcast –
Week of 14 April 1989

pre-FM Triple Vinyl LP

Another Mellencamp Superstar Concert Series show, this time from 1988 recorded in Dallas. Steve Downes handles the hosting duties this time, and original commercial blocks are included.

Complete track listing can be found here:

SCS #CO 89-06 on Discogs

Simple Minds, Peter Gabriel, Dire Straits & Eric Clapton

Superstar Concert Series –The Nelson Mandela 70th Birthday Tribute Concert #CO 89-12:

Westwood One Radio Networks Records

Recorded Live at Wembley Stadium, London, England:
18 June 1988

Original Broadcast –
Unknown Day June 1989

pre-FM Triple Vinyl LP

The second such show recorded at the  Nelson Mandela 70th Birthday Tribute Concert at Wembley Stadium. This version of the show features Simple Minds, Peter Gabriel, Dire Straits and Eric Clapton. (Gabriel only performs one song, Biko, at the end of the Simple Minds set.) Clapton performed alongside his friend Mark Knopfler during the Dire Straits set, because the regular guitar player (Jack Sonni at that time) was at home with his wife and newborn girls. Knopfler mentions this during the middle section of Walk Of Life about the 3:35 mark. In addition, Clapton performed one of his solo classics as well in Wonderful Tonight. Brothers In Arms was performed that day, but is not included on this LP set for reasons unknown. Lastly, there is another version of this concert featuring some of the Simple Minds set, along with tracks by Sting and the Eurythmics, which was broadcast in August of 1988, and is listed above. Steve Downes hosts again, and original commercial blocks are included. Released on translucent vinyl.

Regarding the suspected broadcast date: There were no Cue Sheets with this set when I purchased it, therefore I cannot say for certain when this show originally aired.  This is not a stereo simulcast from that day, but rather a repackaged, trimmed down version aired at a later date. Research has revealed that this particular show was broadcast sometime in June of 1989, one year after the original concert.  If I had to guess, I’d say it probably aired around the anniversary date of 11 June, but I cannot be sure.  

Complete track listing can be found here:

SCS #SS 89-21 on Discogs

Peter Gabriel

Timothy White’s Rock Stars
“The Passion Of Peter Gabriel” #WO 89-E:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 19 June 1989

pre-FM Double Vinyl LP

Timothy White (host and interviewer) profiles Peter Gabriel’s musical history, and his latest releases (at that time) PASSION and PASSION SOURCES. Contains in studio interview segments, recorded live between Gabriel and White at Gabriel’s Real World Studios, original commercial blocks and DJ introductions by White. The final track is taken from Youssou N’Dour’s album THE LION rather than Gabriel’s SHAKING THE TREE (SIXTEEN GOLDEN GREATS), and as such, is a slightly different version than usually played on the radio. Released on translucent vinyl

Complete track listing can be found here:

The Passion Of Peter Gabriel on Discogs

The Who

Off The Record Specials With Mary Turner Part I #89-29:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 10 July 1989

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Pete  Townshend, Roger Daltrey and John Entwistle for this radio broadcast special celebrating the 25th Anniversary of the band. The boys were on the road touring at this time, (in fact, I saw them this exact same week on 6 July at R.F.K. Stadium in Washington, DC ) and the show was released to coincide with the tour.

Commercial blocks and studio tracks are mixed with conversations between Townshend, Daltrey, Entwistle and Turner, designed to sound as if they appear in the studio together. This is Part I of a two-part show; Part II is listed directly below this entry.

This item is not currently listed on Discogs. 

The Who

Off The Record Specials With Mary Turner Part II #89-30:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 17 July 1989

pre-FM Double Vinyl LP

This is Part II of the above listed show. Turner continues her conversation with the three remaining members of The Who, and plays tracks from various albums. Commercial blocks and studio tracks are mixed with conversations between Townshend, Daltrey, Entwistle and Turner, again designed to sound as if they appear in the studio together. 

This item is not currently listed on Discogs. 

Bon Jovi

Off The Record Specials With Mary Turner Part I #89-31:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 24 July 1989

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with John Bon Jovi and Richie Sambora for this radio broadcast special. Commercial blocks and studio tracks are mixed with conversations between Bon Jovi, Sambora and Turner, designed to sound as if they appear in the studio together. Side A Label. This is Part I of a two-part show; Part II is listed below. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #89-31 on Discogs

Bon Jovi

Off The Record Specials With Mary Turner Part II #89-32:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 31 July 1989

pre-FM Double Vinyl LP

This is Part II of the above listed two-part show. Released on translucent vinyl.

This item is not currently listed on Discogs.

Jackson Browne

Off The Record Specials With Mary Turner #89-36:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 28 August 1989

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents another interview with Jackson Browne about his music. Commercial blocks and studio tracks are mixed with conversations between Browne and Turner, designed to sound as if they appear in the studio together. Released on translucent vinyl.

This item is not currently listed on Discogs.

Steve Winwood

Superstar Concert Series #CO 89-23:

Westwood One Radio Networks Records

Recorded Live at
The Great Woods Performance Center

Mansfield, Massachusetts:
22 August 1988

Original Broadcast –
Week of 1 September 1989

pre-FM Triple Vinyl LP

Another in the Superstar Concert Series of shows. Host Steve Downes presents a show featuring Winwood on tour in support of his album ROLL WITH IT. Includes original commercial blocks. This show was originally released in December of 1988 on Superstar Concert Series show #88-G. Released on translucent vinyl.

This item is not currently listed on Discogs.

Tom Petty

Off The Record Specials With Mary Turner #89-38:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 11 September 1989

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Tom Petty. The discussion centers on Petty’s work with The Heartbreakers and the Traveling Wilburys, Petty’s early years and current work. Commercial blocks and studio tracks are mixed with conversations between Turner and Petty, designed to sound as if the appear in the studio together. There are several songs from Petty’s latest (at that time) release, FULL MOON FEVER. 

Complete track listing can be found here:

OTRSP #89-43 on Discogs

Don Henley

Off The Record Specials With Mary Turner #89-43:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 16 October 1989

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Don Henley about his time with The Eagles, musical inspiration, and his latest album (at that time) THE END OF THE INNOCENCE. Commercial blocks and studio tracks are mixed with conversations between Henley and Turner, designed to sound as if they appear in the studio together. Released on translucent virgin vinyl.

Complete track listing can be found here:

OTRSP #89-43 on Discogs

Stevie Ray Vaughan

Timothy White’s Rock Stars – In Step Live With Stevie Ray Vaughan #WO 89-J

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 23 October 1989

pre-FM Double Vinyl LP

Timothy White (host and interviewer) profiles Stevie Ray Vaughan’s musical history, and his latest release (at that time) IN STEP. Contains in studio interview segments with Vaughan, who plays riffs live on his guitar while discussing the various tracks, original commercial blocks and DJ introductions by White. With the exception of a few impromptu jams by Vaughan, the tracks themselves are album cuts and are not performed live in concert as the title suggests. Still, this is a kick-ass set to own, given how short this amazing artist’s time with us was. Released on translucent vinyl.

Complete track listing can be found here:

Timothy White’s Rock Stars SRV on Discogs

Eric Clapton

Timothy White’s Rock Stars – Eric Patrick Clapton #WO 89-L

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 23 December 1989

pre-FM Double Vinyl LP

Timothy White (host and interviewer) profiles Eric Clapton’s musical history, and his latest release (at that time) JOURNEYMAN. Contains in studio interview segments, original commercial blocks and DJ introductions by White. Released on translucent vinyl.

Almost identical to Timothy White’s Rock Stars – Eric Patrick Clapton (Show # WO 90-E) released in May 1990, listed below, but this version has different commercials and was released six months earlier in 1989. In addition, the live tracks on the 1990 release are replaced with the original studio tracks for this release. There is also no mention of the Knebworth festival on this version. The rest of the interview segments are identical.

Complete track listing can be found here:

Timothy White’s Rock Stars Eric Clapton on Discogs

Little Feat

Up Close #89-09:

Media America Radio Networks Records

Unknown recording date

Original Broadcast –
Unknown Month / Day 1989

pre-FM Double Compact Disc

Host Dan Neer plays interview clips from Paul Barrere and Kenny Gradney plus lots of studio tracks from the band. The discussion centers on the history and success of the band and their latest release (at that time) LET IT ROLL. Commercial blocks and studio tracks are mixed with interview clips. Released on translucent vinyl.

Complete track listing can be found here:

Up Close #89-09 on Discogs

Don Henley

Superstar Concert Series #CO 90-01:

Westwood One Radio Networks Records

Recorded Live at The Summit, Houston, Texas:
15 September 1989

Original Broadcast –
Week of 3 February 1990

pre-FM Triple Vinyl LP

Recorded live during Henley’s END OF THE INNOCENCE Tour at The Summit in Houston, Texas on 15 September 1989, Westwood One produced at least two versions of this show. Contains commercial blocks and DJ introductions/segment breaks by Steve Downes.

Complete track listing can be found here:

SCS #CO 90-01 on Discogs

Genesis

Westwood One In Concert #IC 90-03:

Westwood One Radio Networks Records

Recorded Live at The Empire Pool, Wembley, England:
15 April 1975

&

The Nassau Coliseum
Long Island, New York:
29 November 1981

Original Broadcast –
Week of 5 February 1990

pre-FM Double Vinyl LP

This is the fourth and final version of this exact show that I own. Identical to #IC 86-26, #IC 87-09 and #IC 88-25, all listed above. The same Cue Sheet track misidentifications are present here. From my personal collection.

Complete track listing can be found here:

In Concert #I 90-03 on Discogs

Tom Petty

Off The Record Specials With Mary Turner #CO 90-07:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 12 February 1990

pre-FM Double Vinyl LP

Another in the Off The Record Specials series, this time featuring an interview with Tom Petty in support of his 1989 release FULL MOON FEVER. Mary Turner and Petty discuss his career, designed to sound as if the two appear in the studio together, while Turner plays tracks from several Heartbreakers albums. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP # 90-07 on Discogs

Don Henley

Timothy White’s Rock Stars – Don Henley: The Heart Of The Matter #WO 90-B:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 19 February 1990

pre-FM Double Vinyl LP

Timothy White (host and interviewer) profiles Don Henley’s musical career, growing up in Texas, working with his musical partner Danny Kortchmar and his latest release (at that time) THE END OF THE INNOCENCE. Contains in person interview segments with Henley and Kortchmar, who play tunes live in the studio with their band while also discussing the various tracks. Album tracks from several Henley albums are also featured, along with original commercial blocks and DJ introductions by White and Roger Steffens. (Tracks A3, D3 and D8 are performed with full band live in the studio; all other tracks are album tracks.) Unlike many Westwood One interview specials, White plays entire album tracks instead of just a portion between interview segments. Released on translucent vinyl.

Complete track listing can be found here:

Timothy White’s Rock Stars Don Henley on Discogs

Doobie Brothers

Superstar Concert Series #CO 90-04:

Westwood One Radio Networks Records

Recorded Live at an Unknown Venue, Honolulu, Hawaii:
25 January 1990

Original Broadcast –
Week of 17 March 1990

pre-FM Triple Vinyl LP

Recorded live during the Cycles Tour in support of their most recent album (at that time) CYCLES, this outing captures a large portion of the show from that night. Contains original commercial blocks and introductions by Westwood One regular contributor Steve Downes. This release is one of at least three versions of this show in circulation under the Superstar Concert Series banner.

Complete track listing can be found here:

SCS #CO 90-04 on Discogs

Tom Petty And The Heartbreakers

Superstar Concert Series #CO 90-05:

Westwood One Radio Networks Records

Recorded Live at The University Of North Carolina Dean E. Smith Activity Center, Chapel Hill, North Carolina:
13 September 1989

Original Broadcast –
Weekend of 30 March 1990

pre-FM Triple Vinyl LP

Another Superstar Concert Series show, featuring Tom Petty And The Heartbreakers, which was repackaged multiple times by Westwood One as well as having been produced on numerous bootleg discs. Steve Downes handles hosting duties, and original commercial blocks are included.

Complete track listing can be found here:

SCS #CO 90-04 on Discogs

Stevie Ray Vaughan

In Concert #I 90-07:

Westwood One Radio Networks Records

Recorded Live at Tingley Arena, Albuquerque,
New Mexico:
28 November 1989
&
McNichols Arena,
Denver, Colorado:
29 November 1989

Original Broadcast –
Week of 2 April 1990

pre-FM Double Vinyl LP

One of the most bootlegged SRV shows (actually two shows) from Westwood One. In fact, I have an additional copy on double compact disc, which aired in April of 1993 and is listed below.  Steve Downes hosts and original commercial blocks are included. Released on translucent vinyl.

Complete track listing can be found here:

In Concert # I 90-07 on Discogs

Pink Floyd

Off The Record Specials With Mary Turner – On The Road To Knebworth #90-18:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 30 April 1990

pre-FM Double Vinyl LP

Another in the Off The Record Specials series, this one featuring an interview with David Gilmour and Nick Mason of Pink Floyd. This is one of several OTRSP shows from 1990 that focused on bands that were scheduled to perform at the huge Knebworth Festival. Turner and the boys discuss their career, the impact of DARK SIDE OF THE MOON, Roger Waters leaving the band, Rick Wright rejoining the band, and recording new music with him and without Waters… designed to sound as if they all appear in the studio together. Tracks from several Floyd albums are played along with original commercial blocks. Released on translucent vinyl. From my personal collection.

Complete track listing can be found here:

OTRSP #90-18 on Discogs

Eric Clapton

Road To Knebworth Concert Special # 90-EN:

Westwood One Radio Networks Records

Recorded Live at The Royal Albert Hall, London, England:
24 January 1990

Original Broadcast –
Week of 14 May 1990

pre-FM Quadruple Vinyl LP

Eric Clapton performed an eighteen night run at The Royal Albert Hall starting in January 1990, the longest running residency at the famed Hall up to that point. These concerts were performed with four different instrumental formations, a Four Piece Quartet, a Blues Band featuring Buddy Guy and Robert Cray, a nine piece band and an orchestra, the last featuring the National Philharmonic Orchestra conducted by Michael Kamen. He recorded every night with the intention of producing a live album. However, Clapton reportedly was not satisfied with the 1990 concert recordings and therefore delayed the release of the album. Clapton then set a new record by playing a run of twenty-four nights at the Albert Hall between 5 February and 9 March 1991. But it was during that first eighteen night residency in 1990 that this show was recorded and eventually broadcast.

Running On Faith, White Room and Sunshine Of Your Love from this concert were ultimately chosen to be used for the original commercial release of Eric’s live album 24 NIGHTS. Those three songs, along with the remainder of this show, were recorded on 24 January 1990. This concert focuses on the Four Piece Quartet band line-up, featuring Steve Ferrone, Nathan East, Greg Phillinganes and Slowhand himself. This is a killer set to have, which aired well before the 24 NIGHTS album and video were released.

Complete track listing can be found here:

Clapton’s Road To Knebworth # 90-EN on Discogs

Eric Clapton

Off The Record Specials With Mary Turner – On The Road To Knebworth Part I
#90-20:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 14 May 1990

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Eric Clapton about his time with multiple bands such as Delaney And Bonnie, Cream and Derek And The Dominos, his musical inspirations, the upcoming Knebworth 1990 concert and his latest album (at that time) JOURNEYMAN. This is the first part of a two-part show. Part II is listed below. Includes original commercial blocks. Released on translucent virgin vinyl.

Complete track listing can be found here:

OTRSP #90-20 on Discogs

Eric Clapton

Off The Record Specials With Mary Turner – On The Road To Knebworth Part II
#90-21:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 21 May 1990

pre-FM Double Vinyl LP

This is the second part of the two-part show. Part I is listed above. Includes original commercial blocks. Released on translucent virgin vinyl.

Complete track listing can be found here:

OTRSP #90-21 on Discogs

Eric Clapton

Timothy White’s Rock Stars – Eric Patrick Clapton # WO 90-E:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 21 May 1990

pre-FM Double Vinyl LP

Almost identical to Timothy White’s Rock Stars – Eric Patrick Clapton (Show # WO 89-L), from December 1989, listed above, but this version has different commercials and was released six months later in 1990. In addition, the live tracks on this release are replaced with the original studio tracks for the 1989 release. There is also no mention of the Knebworth festival on the 1989 version, but the concert is discussed here. The rest of the interview segments are identical.

Complete track listing can be found here:

Timothy White’s Rock Stars Eric Clapton on Discogs

Paul McCartney

Off The Record Specials With Mary Turner #90-25:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 18 June 1990

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner talks to Sir Paul McCartney about his musical career, The Beatles, Wings, his upcoming appearance at the Knebworth 1990 concert, and his latest (at the time) solo effort FLOWERS IN THE DIRT. This is another in the series of OTRSP shows dealing with the giant Knebworth Festival, and as with all of the OTRSP shows, it is designed to sound as if the two appear together.

Commercial blocks and studio tracks are mixed with conversations between McCartney and Turner, who, again, do not appear in the studio together.  Released on translucent vinyl. This is an extremely rare and hard to find item, and one of my prized possessions in my collection.

Complete track listing can be found here:

OTRSP #90-25 on Discogs

Bruce Hornsby And The Range

Superstar Concert Series #CO 90-17:

Westwood One Radio Networks Records

Recorded Live at Paramount Studios,
Los Angeles, California:
XX-XX-1989 / 90

Original Broadcast –
Week of 21 July 1990

pre-FM Triple Vinyl LP

Westwood One Radio Networks show featuring an intimate live performance from Bruce Hornsby And The Range during their Night On The Town Tour. Recorded on the soundstage located at Paramount Studios in front of a small audience, and featuring specials guests including Jerry Garcia, Béla Fleck, Joe Henderson and Jimmie Wood. Includes original commercial blocks and radio intros by Westwood One regular contributor Steve Downes. Released on translucent vinyl.

*MISPRINT NOTE: The Cue Sheet for this set indicates that the show number is CO 90-29, while the labels clearly state that the show number is CO 90-17. When one examines the runouts etched in the deadwax, the “29” has been crossed out on all six sides, and is then followed by “17”. Thus, the show number is CO 90-17, and the Cue Sheet contains a misprint.

Complete track listing can be found here:

SCS #CO 90-17 on Discogs

Robert Plant

Off The Record Specials With Mary Turner #90-34:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 20 August 1990

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner again talks to Robert Plant about his musical career, his latest album (at that time) MANIC NIRVANA, and his time with Led Zeppelin. Commercial blocks and studio tracks are mixed with conversations between Plant and Turner, designed to sound as if they appear in the studio together.  Released on translucent vinyl. 

Complete track listing can be found here:

OTRSP #90-34 on Discogs

Bruce Hornsby And The Range

Superstar Concert Series #CO 90-45:

Westwood One Radio Networks Records

Recorded Live at The Palace Theatre,
Columbus, Ohio
&
The Concord Pavilion, Concord, California:
XX-XX-1989 / 90

Original Broadcast –
Week of 10 November 1990

pre-FM Triple Vinyl LP

Westwood One Radio Networks show featuring two live performances from Bruce Hornsby And The Range during their Night On The Town Tour. Includes original commercial blocks and radio intros by Westwood One regular contributor Phil Hendrie. Released on translucent vinyl

Complete track listing can be found here:

SCS #CO 90-45 on Discogs

The Eagles

Pink Champagne On Ice
A Celebration Of An American Band #90-47:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 22 November 1990

pre-FM Triple Compact Disc

A Westwood One Radio Networks three-hour, three disc interview and music special featuring a tribute to The Eagles which aired on U.S. radio stations during Thanksgiving weekend, November 1990. Contains original commercial blocks and DJ introductions by David Perry. Interview segments with Don Henley and Glenn Frey are mixed with classic Eagles tracks spanning their entire career. (Henley and Frey do not appear in the studio with Perry; their segments were pre-recorded.)

Complete track listing can be found here:

Pink Champagne On Ice on Discogs

Steve Winwood

Off The Record Specials With Mary Turner #90-50:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 10 December 1990

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents another interview with Steve Winwood for this radio broadcast special promoting Steve’s 1990 release, REFUGEES OF THE HEART. Commercial blocks and studio tracks are mixed with conversations between Winwood and Turner, designed to sound as if they appear in the studio together. Released on translucent vinyl.

This item is not currently listed on Discogs.

Talking Heads

Superstar Concert Series #CO 90-52:

Westwood One Radio Networks Records

Recorded Live at an Unknown Venue, Milwaukee, Wisconsin:
XX-XX-1984

Original Broadcast –
Week of 29 December 1990

pre-FM Triple Vinyl LP

Recorded live in Milwaukee, Wisconsin during the STOP MAKLING SENSE Tour in 1984, this outing captures a large portion of the show from that night. Contains original commercial blocks and introductions by Westwood One regular contributor Phil Hendrie. This release is one of at least two versions of this show in circulation under the Superstar Concert Series banner.

Complete track listing can be found here:

SCS #CO 90-52 on Discogs

Dire Straits / The Police

Westwood One In Concert #I 90-08:

Westwood One Radio Networks Records

Recorded Live at The Paris Theatre, London, England:
22 July 1978
&
Hatfield Polytechnic, Hertfordshire, England:
21 February 1979

Original Broadcast –
Unknown Month / Day 1990

pre-FM Double Vinyl LP

Westwood One presents a double-bill featuring Dire Straits and The Police. Both of these shows are available in multiple other formats, including in my own collection. Released on translucent vinyl.

Complete track listing can be found here:

SCS #CO 90-52 on Discogs

Paul McCartney: Up-Close # 90-06:

Media America Radio Records

Unknown recording date

Original Broadcast –
Unknown Month / Day 1990

pre-FM Double Compact Disc

Another in the Up Close series with Dan Neer. Includes history, interviews and lots of great Paul McCartney and Beatles music. 

The set features tracks from McCartney’s latest release (at time) FLOWERS IN THE DIRT. McCartney, as usual, does not appear in the studio with Neer. Commercial blocks are included. This show was sent to radio stations in a double “fatboy case” package with front and back covers.

Complete track listing can be found here:

Up Close # 90-06 on Discogs

Dire Straits / The Kinks

Westwood One In Concert #I 91-32:

Westwood One Radio Networks Records

Recorded Live at The Paris Theatre, London, England:
22 July 1978
&
Unknown Location / Date

Original Broadcast –
5 August 1991

pre-FM Double Vinyl LP

Another Westwood One double-bill, this time featuring Dire Straits and The Kinks. The venue and date for the Kinks portions of the show is never mentioned. Both of these shows are available in multiple other formats, including in my own collection. Contains original commercial blocks and DJ intros by Tawn Mastrey.  Released on translucent vinyl.

Complete track listing can be found here:

SCS #CO 91-32 on Discogs

Sting

Up Close #91-16:

Media America Records

Unknown recording date

Original Broadcast –
Week of 29 July 1991

pre-FM Double Compact Disc

Host Dan Neer interviews Sting about his career, playing live and his latest release (at that time) THE SOUL CAGES. Includes several tracks from the aforementioned album, along with live cuts and tracks by The Police. Original commercial blocks are also included.

Complete track listing can be found here:

Up Close #91-16 on Discogs

Paul Simon

Off The Record Specials With Mary Turner #91-32:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 5 August 1991

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner talks to Paul Simon about his musical career, playing with Art Garfunkel, his latest release (at that time) THE RHYTHM OF THE SAINTS, and his upcoming (at that time) concert in Central Park, which had yet to be performed. This show was broadcast the week before the famous concert was recorded, and was designed to sound as if the two appear in the studio together.

This item is not currently listed on Discogs.

Elton John

King Biscuit Flower Hour #KB 91-XX:

D.I.R. Broadcasting Records

Recorded Live at Poplar Creek Music Theatre, Chicago, Illinois:
16 September 1988

Original Broadcast –
Week of 19 – 25 August 1991

pre-FM Single Compact Disc

Another King Biscuit show featuring a live performance from Elton John during his Reg Strikes Back Tour. Includes Cue Sheet and sleeve envelope housing the disc. Bill Minkin handles the hosting duties, as usual.

*Note: The Cue Sheet lists Track 3 as containing the song Your Song. This is a typo. The song is actually Candle In The Wind.

Complete track listing can be found here:

KBFH Elton John 1991 on Discogs

Traffic

Westwood One In Concert #I 91-44:

Westwood One Radio Networks Records

Recorded Live at The Paris Theatre, London, England:
30 April 1970

Original Broadcast –
Week of 28 October 1991

pre-FM Double Vinyl LP

Another from the Westwood One In Concert series, this time featuring a classic performance from Traffic. This show was duplicated many times by Westwood One for broadcast, and this is on of the later incarnations. Although the recording date and location are never mentioned, investigation has revealed the show was performed in London at the listed venue. (Host Tawn Mastery does state the concert was performed in 1970, but that is the only indication given during the show.)

This item is not currently listed on Discogs, although other versions are and can be viewed HERE.

Genesis

King Biscuit Flower Hour: Genesis Chronicles
#KB 91-XX:

D.I.R. Broadcasting Records

Recorded Live at Various Locations / Dates

Original Broadcast –
Week of 9 December 1991

pre-FM Single Compact Disc

This set features numerous tracks by Genesis, spanning the Phil Collins years, starting in 1977 and leading into the 1986 Invisible Touch Tour. Tracks from concerts at The Nassau Coliseum , The Philadelphia Spectrum and The Los Angeles Forum. The venue for the lone track from 1977, The Lamb Lies Down On Broadway, is never identified on the recording. Contains original commercial blocks and DJ introductions by King Biscuit regular contributor Bill Minkin. 

It should also be noted that the Cue Sheet indicates the recording date for the final two tracks (from the L.A. Forum) were recorded in 1976. This is an obvious typo as these songs were not even written until 1986 and 1980 respectively. These tracks are definitely taken from the famous L.A. Forum show from October 1986.

Complete track listing can be found here:

KBFH Genesis Chronicles on Discogs

Sting

Superstar Concert Series #92-03:

Westwood One Radio Networks Records

Recorded Live at The Hollywood Bowl,
Hollywood, California:
2 October 1991

Original Broadcast –
Week of 18 January 1992

pre-FM Triple Vinyl LP

Another in the Superstar Concert Series of shows, this time containing original commercial blocks and DJ introductions and segment breaks by Suzy Cruz. Recorded on The Soul Cages Tour. This particular night was Sting’s 40th birthday and the show was duplicated many times on bootleg compact discs. Released on translucent virgin vinyl.

Complete track listing can be found here:

SCS #92-03 on Discogs

Eric Clapton

Off The Record Specials With Mary Turner Part I #92-05

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 27 January 1992

pre-FM Double Vinyl LP

Another in the Off The Record Specials series. Mary Turner presents an interview with Eric Clapton about his musical inspirations, living in the public eye and his latest album (at that time) RUSH – ORIGINAL MOTION PICTURE SOOUNDTRACK. This is the first part of a two-part show; Part II is listed below. Includes original commercial blocks. Released on translucent virgin vinyl.

Complete track listing can be found here:

OTRSP #92-05 on on Discogs

Eric Clapton

Off The Record Specials With Mary Turner Part II #92-06:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 3 February 1992

pre-FM Double Vinyl LP

This is the second part of the above listed two-part show. Includes original commercial blocks. Released on translucent virgin vinyl.

Complete track listing can be found here:

OTRSP #92-06 on on Discogs

Tom Petty

Off The Record Specials With Mary Turner #92-14:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 30 March 1992

pre-FM Double Vinyl LP

Another in the Off The Record Specials series, this one featuring an interview with Tom Petty in support of his 1989 release FULL MOON FEVER. Turner and Petty discuss his career in a manner designed to sound as if they appear together, and she plays tracks from several Heartbreakers albums. Released on translucent vinyl.

Complete track listing can be found here:

OTRSP #92-14 on on Discogs

Genesis

King Biscuit Flower Hour L.A. Forum Two Part Special #KB 92-XX:

D.I.R. Broadcasting Records

Recorded Live at The Forum, Los Angeles, California:
14 – 15 October 1986

Original Broadcast –
Part I: 1 – 7 June 1992
Part II: 8 – 14 June 1992

pre-FM Double Compact Disc

Exact same show as the above listed Best Of The Biscuit two LP set from June 1987, but repackaged onto compact disc for airplay the same dates in 1992. This was the first of many reproductions of this show onto compact disc, some of which are listed below. Contains original commercial blocks and DJ intros by King Biscuit regular contributor Bill Minkin.

*These are two of three shows in my collection that I obtained SEALED, UNOPENED and UNPLAYED. The King Biscuit mailer boxes that you see in the scans came sealed in shrink wrap with a sticker on the outside front of each indicating the broadcast date only. No info was provided (at least on the box or sticker) of the artist contained within. That’s not meant to imply that I didn’t know what I was buying; the seller on eBay knew the contents based on the broadcast date. Prior to this purchase, I had never seen a sealed King Biscuit show.

Complete track listing can be found here:

KBFH Genesis L.A. Forum CDs on Discogs

Eric Clapton

The History Of Eric Clapton #92-36:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast – Week of 4 – 7 September 1992

pre-FM Sextuple Compact Disc

Westwood One Host David Perry presents a six-disc, six-hour show detailing Clapton’s entire musical career through dozens of interviews, studio tracks and live cuts. Interview segments from Clapton, Jack Bruce, Ginger Baker, Peter Brown and many others. Contains original commercial blocks and segment intros by Perry.

Each disc came housed in a separate, identical paper sleeve.

This item is not currently listed on Discogs.

Peter Gabriel

Off The Record Specials With Mary Turner #92-46:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 9 November 1992

pre-FM Single Compact Disc

Mary Turner interviews Peter Gabriel, and discusses his latest release (at that time) US. The two also discuss Gabriel’s collaborations with international musicians, how his divorce impacted his music and his desire to build a multi-sensory international amusement park. Commercial blocks and studio tracks are mixed with conversations between Gabriel and Turner. A very similar show to this was later released (with slightly different commercials and slightly different songs featured on Track 4) in March of 1993 and can be found on OTRSP #93-14, listed below.

Complete track listing can be found here:

OTRSP #92-46 on on Discogs

Keith Richards

Up Close Parts I – III #93-03 / 93-04 / 93-05:

Media America Radio Records

Unknown recording date

Original Broadcast –
11 January 1993

pre-FM Triple Compact Disc

Another in the Dan Neer series of Up Close shows, this one released to coincide with Richards’ MAIN OFFENDER release. Commercial blocks and studio tracks are mixed with conversations between Richards and Neer, who do not appear in the studio together. This is a three-part show released on three discs.

A track listing that leaves much to be desired can be found here:

Up Close 93-03 / 04 / 05 on Discogs

Keith Richards

Timothy White Sessions #93-04:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast – Week of 18 January 1993

pre-FM Double Compact Disc

Timothy White (rock journalist and Editor In Chief of Billboard Magazine) interviews Keith Richards live in person on the final night of band dress rehearsals for the 1993 U.S. tour in support of his latest release (at that time) MAIN OFFENDER.

The “session” was recorded in New York city in the studio where Keith and his band, The X-Pensive Winos, were preparing for the tour, and during the show, the band performs several songs live in person. Interview segments between White and Richards are interspersed with album tracks and original commercial blocks. All of the live tracks except Whip It Up were recorded live during the “session”; Whip It Up was taken from the concert album LIVE AT THE HOLLYWOOD PALADIUM. The show also features a radio exclusive broadcast of Key To The Highway, a bonus track taken from the Japan release of MAIN OFFENDER. Each disc came housed in a separate Westwood One paper sleeve.

Complete track listing can be found here:

Timothy White Sessions #93-04 on Discogs

Peter Gabriel

Up Close Parts I – II #93-07 / 93-08:

Media America Radio Records

Unknown recording date

Original Broadcast –
28 January 1993

pre-FM Double Compact Disc

Another in the Dan Neer series of Up Close shows, this one released to coincide with Gabriel’s SECRET WORLD LIVE release. Commercial blocks and studio tracks are mixed with conversations between Gabriel and Neer, who do not appear in the studio together. Unlike the above listed Keith Richards Up Close show, this is a two-part show released on two compact discs.

Complete track listing can be found here:

Up Close 93-07 / 08 on Discogs

Sting

Up Close #s 93-13 / 14 / 15:

Media America Radio Records

Unknown recording date

Original Broadcast –
Part I: 15 February 1993
Part II: 22 February 1993
Part III: 1 March 1993

pre-FM Triple Compact Disc

Another in the Up Close series in which Host Dan Neer plays interview clips and songs from Sting. This is a three-part show containing lots of tracks and commercial blocks, released to coincide with Sting’s TEN SUMMONER’S TALES album.

Complete track listing can be found here:

Up Close #93-13 / 14 / 15 on Discogs

Pearl Jam / The Police

Superstar Concert Series #93-13:

Westwood One Radio Networks Records

Recorded Live at Finsbury Park, London, England: 6 June 1992

&

Hatfield Polytechnic, Hertfordshire, England:
21 February 1979

Original Broadcast – Week of 27 March 1993

pre-FM Double Compact Disc

This is a double-bill set featuring both listed artists captured live in concert. Disc I features the Pearl Jam set, which was recorded in England on their first ever tour, while Disc II features the Police set, which was recorded on their first tour as well. I still remember recording this show onto a cassette tape which I still have, off FM radio when it aired. My copy of this show on CD came with photocopies of the Cue Sheets, and as such, the Pearl Jam sheet was considerably smaller than the usual 8 1/2 x 11 sheet provided by Westwood One. I have provided a scan here, but it is not the usual quality one might expect.

Of note is the fact that the host claims the Pearl Jam set was recorded at Finsley Park, which does not exist.

Complete track listing can be found here:

SCS #93-13 on Discogs

Peter Gabriel

Off The Record Specials With Mary Turner #93-14:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 29 March 1993

pre-FM Single Compact Disc

Mary Turner interviews Peter Gabriel, and discusses his latest release (at that time) US. The two also discuss Gabriel’s collaborations with international musicians, how his divorce impacted his music and his desire to build a multi-sensory international amusement park. Commercial blocks and studio tracks are mixed with conversations between Gabriel and Turner. A very similar show to this was later released (with slightly different commercials and slightly different songs featured on Track 4) in November of 1992, and can be found on OTRSP #92-46, listed above.

Complete track listing can be found here:

OTRSP #93-14 on on Discogs

Stevie Ray Vaughan

Superstar Concert Series #93-17:

Westwood One Radio Networks Records

Recorded Live at Tingley Arena, Albuquerque,
New Mexico:
28 November 1989
&
McNichols Arena,
Denver, Colorado:
29 November 1989

Original Broadcast –
Week of 19 April 1993

pre-FM Double Compact Disc

This is the same concert from April 1990, which is listed above, repackaged onto compact disc for rebroadcast.

Complete track listing can be found here:

SCS #93-17 on on Discogs

The Robert Cray Band / Hothouse Flowers

King Biscuit Flower Hour #93-XX:

D.I.R. Broadcasting Records

Recorded Live at The Paramount Theatre, Springfield, Massachusetts:
XX-XX-1989

Original Broadcast – Week of 8 – 14 November 1993

pre-FM Single Compact Disc

D.I.R. Radio Network show featuring two live performances, the first from The Robert Cray Band, and the second featuring Hothouse Flowers. The Flowers performance is included as part of the Biscuit’s “Future Classic Artists” segment, and was recorded at a separate concert from the Cray performance. The venue for the Flowers’ performance is never mentioned during the show, but Cray’s performance was recorded live at The Paramount Theatre in Springfield, Massachusetts during his 1989 tour. Includes Cue Sheet and sleeve envelope housing the disc. Once again, Bill Minkin handles the hosting duties for this show.

Complete track listing can be found here:

KBFH #93-XX on Discogs

Sting

The Ten Summoner’s Tales Interview Disc 

A&M Records

Recorded in New York / Unknown day, February 1993

Original Broadcast –Unknown Month / Day 1993

pre-FM Single Compact Disc

This is an official promotional disc released by A&M Records to coincide with Sting’s TEN SUMMONER’S TALES album. As with other promo releases of this type, Sting is interviewed on the first track, and then the individual answers are provided on subsequent tracks to allow DJs to simulate a live, in studio interview with the artist. The Discogs listing states that the interview took place in New York in February of 1993. There are no commercial blocks on this disc.

Complete track listing can be found here:

Sting Interview Disc on Discogs

Sting

Off The Record Specials With Mary Turner #94-08:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 14 February 1994

pre-FM Single Compact Disc

Mary Turner interviews Sting, and discusses his latest release (at that time) TEN SUMMONER’S TALES. The two also discuss Sting’s time with The Police. Commercial blocks and studio tracks are mixed with conversations between Sting and Turner. 

Complete track listing can be found here:

OTRSP #94-08 on on Discogs

Peter Gabriel

Off The Record Specials With Mary Turner #94-29:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 11 July 1994

pre-FM Single Compact Disc

Mary Turner interviews Peter Gabriel, and discusses his latest release (at that time) US. The two also discuss Gabriel’s time with Genesis and his upcoming Womad Festival. Commercial blocks and studio tracks are mixed with conversations between Gabriel and Turner.

Complete track listing can be found here:

OTRSP #94-29 on on Discogs

Spin Doctors

Up Close #94-35:

Media America Radio Records

Unknown recording date

Original Broadcast –

Week of 22 – 28 August 1994

pre-FM Single Compact Disc

Another in the Dan Neer series of Up Close shows, this one detailing the band’s second release TURN IT UPSIDE DOWN. Commercial blocks and studio tracks are mixed with conversations between band members Aaron Comess, Mark White, Chris Barron and Eric Schenkman and Neer, who do not appear in the studio together. 

This item is not currently listed on Discogs.

Peter Gabriel

Up Close #94-45 / 46:

Media America Radio Records

Unknown recording date

Original Broadcast –

Unknown Month / Day 1994

pre-FM Double Compact Disc

Another in the Dan Neer series of Up Close shows, this one detailing Peter Gabriel’s career up to his latest release (at that time) US. Commercial blocks and studio tracks are mixed with conversations between Gabriel and Neer, who do not appear in the studio together. 

This item is not currently listed on Discogs.

Genesis / Rusted Root

King Biscuit Flower Hour L.A. Forum Two Part Special #KB 95-XX:

D.I.R. Broadcasting Records

Recorded Live at The Forum, Los Angeles, California:
14 – 15 October 1986
&
An Unknown Location / Date

Original Broadcast –
Part I –  13 – 19 February 1995
Part II –  20 – 26 February 1995

pre-FM Double Compact Disc

Exact same L.A. Forum show as the show on compact discs from June 1992, but repackaged onto compact disc for airplay in February of 1995. In addition, this show contains tracks from the band Rusted Root on both discs under the Biscuit’s “Future Classic Artists” segment. The recording location and date for the Rusted Root segments are never mentioned. Contains original commercial blocks and DJ intros by King Biscuit regular contributor Bill Minkin.

This item is not currently listed on Discogs.

U2

In The Studio
Show #360:

Achtung Baby 

The Album Network

Unknown recording date

Original Broadcast –

Week of 15 May 1995

pre-FM Single Compact Disc

Another In The Studio episode featuring an interview with Bono, The Edge, Adam Clayton and Larry Mullen Jr. and nationally syndicated DJ / host Redbeard. For this outing, the boys discuss the making of the album ACHTUNG BABY.

Tracks from the album are played, and there are commercial blocks as well. There are five tracks on the CD. From my personal collection.

Complete track listing can be found here:

In The Studio #360 on Discogs

Paul Simon / Bonnie Raitt

King Biscuit Flower Hour #95-21:

King Biscuit Flower Hour Radio Records

Recorded Live at The Tower Theatre, Philadelphia, Pennsylvania:
7 October 1980

& The Orpheum Theatre, Minneapolis, Minnesota:
5 July 1979

Original Broadcast –

Week of 15 – 21 May 1995

pre-FM Single Compact Disc

Another King Biscuit double bill show, this time featuring classic performances from Paul Simon and Bonnie Raitt.  Bill Minkin hosts and original commercial blocks are included.

This item is not currently listed on Discogs.

Eric Clapton

Still Got The Blues – The Eric Clapton Story #95-22:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –

Week of 27 May 1995

pre-FM Sextuple Compact Disc

Here is another six-disc, six-hour Eric Clapton retrospective radio special. This time, Westwood One Host Richard Skinner details Clapton’s entire musical career through dozens of interviews, studio tracks and live cuts.

Interview segments from Clapton, John Mayall, Jeff Beck, Pete Townshend, George Harrison, Jack Bruce, Ginger Baker, Ronnie Lane, Glyn Johns, Tom Dowd, Phil Collins, Tina Turner, and Elton John are all featured.

Contains original commercial blocks and segment intros by Skinner. The title is derived from Skinner’s introduction on each disc, although only The Eric Clapton Story appears on the discs themselves.

Each disc came housed in a separate, identical paper sleeve.

Complete track listing can be found here:

Eric Clapton Still Got The Blues on Discogs

Genesis

King Biscuit Flower Hour L.A. Forum Two Part Special #KB 96-07 / 08:

King Biscuit Flower Hour Radio Records

Recorded Live at The Forum, Los Angeles, California:
14 – 15 October 1986

Original Broadcast –
Part I –  12 – 18 February 1996
Part II – 19 – 25 February 1996

pre-FM Double Compact Disc

Exact same L.A. Forum show as the show on compact discs from June 1992 and February 1995, but repackaged onto compact disc for airplay in February of 1996. Unlike the February ’95 version, this show does not contain any tracks from Rusted Root, nor does Bill Minkin make an appearance. Contains original commercial blocks and DJ intros by Up Close host Dan Neer.

Sometime after May 1995 and before February 1996, Neer took over hosting duties from King Biscuit regular contributor Bill Minkin. I don’t have an exact date that this change occurred, but evidence is shown in the above KBFH show featuring Paul Simon and Bonnie Raitt. Minkin hosted that show, and it aired in mid-May of ’95. This show aired in mid-February of ’96, and featured Neer as the host.

There are at least two other known two-disc versions of this show, released on compact disc in 1994 and 1998, but I do not have copies of either in my collection. (I previously  had a copy of Disc II from the 1998 release, but sold it as I have never found a copy of Disc I.) From my personal collection.

This item is not currently listed on Discogs.

Cracker

Up Close #96-23:

Media America Radio Records

Unknown recording date

Original Broadcast –

3 June 1996

pre-FM Single Compact Disc

Another in the Dan Neer series of Up Close shows, this one released to coincide with the bands’ 1996 release THE GOLDEN AGE. Commercial blocks and studio tracks are mixed with conversations between band members Dave Lowery and Johnny Hickman and Neer, who do not appear in the studio together. 

Complete track listing can be found here:

Up Close #96-23 on Discogs

Tom Petty And The Heartbreakers

Superstar Concert Series #96-36:

Westwood One radio Networks Records

Live at The University Of Florida Stephen C. O’Connell Center
Gainesville, Florida:
4 November 1993

Original Broadcast –

2 September 1996

pre-FM Double Compact Disc

Westwood One two-disc (but not two-part) show featuring classic songs by Tom Petty and his band The Heartbreakers. A highly edited version of the famous “Homecoming Concert.” Contains commercial blocks and DJ introductions by J.J. Jackson. 

Complete track listing can be found here:

SCS #96-36 on Discogs

U2

In The Studio
Show #430:

Rattle And Hum 

The Album Network

Unknown recording date

Original Broadcast –

Week of 16 September 1996

pre-FM Single Compact Disc

Another In The Studio episode featuring an interview with Bono, The Edge, Adam Clayton and Larry Mullen Jr. and nationally syndicated DJ / host Redbeard. For this outing, the boys discuss the making of the album RATTLE AND HUM.

Tracks from the album are played, and there are commercial blocks as well. There are four tracks on the CD. From my personal collection.

While this exact item is not currently listed on Discogs, there is an earlier broadcast disc with the same show and track listing, which can be found here:

In The Studio #344 on Discogs

John Mellencamp

Superstar Concert Series #96-46:

Westwood One radio Networks Records

Live at World Music Theater, Chicago, Illinois:
27 August 1994

Original Broadcast –

11 November 1996

pre-FM Double Compact Disc

Another Westwood One two-disc (but not two-part) show featuring classic songs by John Mellencamp. Broadcast to coincide with his latest release (at that time) MR. HAPPY GO LUCKY, this is a re-broadcast of a concert previously recorded in 1994, and is hosted by J.J. Jackson. The set includes multiple classic Mellencamp tracks.

This item is not currently listed on Discogs.

Mark Knopfler

Words + Music
#PRO-CD-8201:

Warner Brothers Records

Unknown recording date

Original Broadcast –

Unknown Month / Day 1996

pre-FM Single Compact Disc

This is another official promotional disc, this time produced by Warner Brothers Records. Mark discusses his very first solo effort,  GOLDEN HEART. There are no commercial blocks on this disc. Interestingly, this disc was produced without a front cover; the jewel case only containing the disc and a back cover. (If a front cover, exists, I have never seen it accompanying this item.)

Complete track listing can be found here:

Knopfler Words + Music on Discogs

U2

Off The Record Special #97-17:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
Week of 21 April 1997

pre-FM Single Compact Disc

Another Westwood One Radio Networks Off The Record show featuring U2. This one is different from most in that the host is not Mary Turner. The host for this one only identifies herself as “Tawn.” For this outing, she plays interview clips from Bono, The Edge and Adam Clayton, along with studio and live tracks. The boys discuss a bit of their history, playing live, and their latest release (at that time) POP.

Complete track listing can be found here:

OTRSP #97-17 on Discogs

Sting

Superstar Concert Series #97-30:

Westwood One Radio Networks Records

Recorded Live at The Cynthia Woods Mitchell Pavilion, Houston, Texas:
8 September 1996

Original Broadcast –
Week of 21 July 1997

pre-FM Double Compact Disc

Recorded live on the final night of Sting’s 1996/97 Mercury Falling Tour, the songs from this show have appeared on several popular bootlegs. However, this is the original Westwood One recording sent to U.S. radio stations for broadcast in July 1997. Presented on two compact discs, but intended to be aired on one night rather than on consecutive weekends as some Westwood One shows were.

Complete track listing can be found here:

SCS #97- 30 on Discogs

Dire Straits

King Biscuit Flower Hour #98-16:

King Biscuit Flower Hour Radio Records

Recorded Live at The Summit Theatre,
Houston, Texas:
17 August 1985

Original Broadcast –
Week of 13 April 1998

pre-FM Single Compact Disc

Repackaging of a concert from the Brothers In Arms tour. Contains original commercial blocks and DJ intros by Ed Sciaky (pronounced Shockey).

Complete track listing can be found here:

OTRSP #98-16 on Discogs

Genesis

Superstar Concert Series #99-33:

Westwood One Radio Networks Records

Recorded Live at The Nassau Coliseum:
29 November 1981
&
The Forum,
Los Angeles, California:
13 – 14 January 1984

Original Broadcast –
Week of 14 – 15 August 1999

pre-FM Double Compact Disc

Here is another in the Superstar Concert Series of shows, this time featuring a “greatest hits” style show with Genesis. Although this is a two-disc show, it was not designed to be aired on consecutive nights or weekends. This show was broadcast in one 90 minute window in August 1999. Featuring performances from 1981 and 1984, all tracks presented are previously available on other Westwood One shows listed above. Host J.J. Jackson handles the segments breaks, with original commercial blocks included. This exact show was repackaged for broadcast in August 2000 under show #00-35, but I’ve only ever been able to find Part I for sale online.

This item is not currently listed on Discogs.

Genesis

King Biscuit Flower Hour #KB 99-45:

D.I.R. Broadcasting Records

Recorded Live at The Forum, Los Angeles, California:
14 – 15 October 1986

Original Broadcast –
Week of 1 – 7 November 1999

pre-FM Single Compact Disc

This is an abbreviated version of the two-part L.A. Forum show from 1986. Instead of both parts, the Biscuit shortened the show down to one disc of just the hits. The hosting duties for this one are handled by Ed Sciaky.

Complete track listing can be found here:

KBFH #99-45 on Discogs

Dire Straits / Mark Knopfler

Superstar Concert Series #SS 02-03:

Westwood One Radio Networks Records

Recorded Live at
The Paris Theatre,
London, England:
22 July 1978
&
Wembley Arena,
London, England:
10 July 1985
&
Colston Hall,
London, UK:
19 May 1996 

Original Broadcast –
19 January 2002

pre-FM Double Compact Disc

Westwood One two-disc (but not two-part) show featuring classic songs by Dire Straits and Mark Knopfler. The show features performances from two “first tours;” one from the Straits in 1978 and one from Knopfler in 1996. Sandwiched in between is a performance from 1985’s Brothers In Arms tour.  Contains commercial blocks and DJ introductions by J.J. Jackson.

Complete track listing can be found here:

SCS #SS 02-03 on Discogs

The Steve Miller Band

Superstar Concert Series #SS 03-37:

Westwood One Radio Networks Records

Recorded Live at
The Concord Pavalion, Concord, California:
16 July 1989

 

Original Broadcast –
13 September 2003

pre-FM Double Compact Disc

Another Westwood One two-disc (but not two-part) show featuring classic songs by The Steve Miller Band.  The show was broadcast to coincide with the release of the band’s Greatest Hits album, which came out the following week. Contains commercial blocks and DJ introductions by J.J. Jackson.

This item is not currently listed on Discogs.

 

Mark Knopfler

Off The Record Classic
#OTRCL 04-44:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
30 October 2004

pre-FM Single Compact Disc

“Uncle” Joe Benson chronicles the life and music of Mark Knopfler, including contributions to his historic band Dire Straits, and he actually interviews Knopfler in the studio for this one hour radio special. (And given that the two appear together, Knopfler took over the Segment Intro duties on this show.) Some of the interview bits (specifically the ones where Knopfler discusses Dire Straits music) were recycled later and also appeared on a 2008 Off The Record radio special, listed below. The show contains commercials and studio tracks from several of the band’s albums, plus Knopfler’s solo tunes. Released to coincide with Knopfler’s latest (at that time) solo album SHANGRI-LA.

Tracks 1 – 4 are the actual radio show, Tracks 5 – 7 are promo spots, Tracks 8 – 17 are commercial spots, while Tracks 18 – 29 are the actual interview segments separated into individual tracks.

Complete track listing can be found here:

OTRCL # 04-44 on Discogs

Mark Knopfler

Off The Record Classic
#OTRCL 08-43:

Westwood One Radio Networks Records

Unknown recording date

Original Broadcast –
18 October 2008

pre-FM Single Compact Disc

Almost identical to the OTRCL # 04-44 from October 2004, listed above. “Uncle” Joe Benson and Knopfler again discuss all things Dire Straits, as well as Knopfler’s solo career.

Tracks 1 – 4 are the actual radio show, Tracks 5 – 7 are promo spots, Tracks 8 – 15 are commercial spots, while Tracks 16 – 27 are the actual interview segments and segment intros separated into individual tracks.

Complete track listing can be found here:

OTRCL # 08-43 on Discogs

That’s it… for now. As I add shows to my collection, I will add them here.